{"id":41769,"date":"2024-03-08T19:07:47","date_gmt":"2024-03-08T16:07:47","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/ir\/?post_type=info_aga&#038;p=41769"},"modified":"2024-11-17T17:40:58","modified_gmt":"2024-11-17T17:40:58","slug":"17-04-2024-2","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/ir\/2024\/03\/08\/17-04-2024-2\/","title":{"rendered":"17.04.2024"},"content":{"rendered":"<p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Convocator-COMPLETAT-AGA-17.04.2024.pdf\">Convocatorul Completat al Adunarii Generale Ordinare si Extraordinare a Actionarilor din data de 17.04.2024<\/a><\/p>\n<p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Convocator-AGA-17.04.2024.pdf\">Convocatorul Adunarii Generale Ordinare si Extraordinare\u00a0 a Actionarilor din data de 17.04.2024<\/a><\/p>\n<p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2022\/01\/RO-REGULAMENT-AGA_SNN_-septembrie-2020-1.pdf\" data-slimstat=\"3\">Regulamentul privind organizarea si desfasurarea Adunarilor Generale ale Actionarilor SNN actualizat la nivelul lunii octombrie 2020 prin Decizia Consiliului de Administratie nr. 205\/15.10.2020<\/a><\/p>\n<h1>Adunarea Generala Ordinara a Actionarilor<\/h1>\n<p><strong>Punctul 2:<\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/AGOA-PCT-2-Nota-SPF-AGA-Finala-.pdf\">Aprobarea deciziei privind continuarea proiectului Reactoarelor Modulare Mici (SMR), in baza documentatiei tip studiu de prefezabilitate (rev 1.1), elaborata in conformitate cu cerintele HG nr. 907\/2016 privind etapele si continutul-cadru al documentatiilor tehnico-economice aferente obiectivelor de investitii financiare din fonduri publice.<\/a><\/p>\n<p>La punctul 2 de pe ordinea de zi a AGOA, SNN a publicat nota privind <strong>Aprobarea deciziei privind continuarea proiectului Reactoarelor Modulare Mici (SMR), in baza documentatiei tip studiu de prefezabilitate (rev 1.1), elaborata in conformitate cu cerintele HG nr. 907\/2016 privind etapele si continutul-cadru al documentatiilor tehnico-economice aferente obiectivelor de investitii financiare din fonduri publice<\/strong><strong>.<\/strong><\/p>\n<p>Pentru protejarea intereselor sale comerciale legitime, precum si cele ale Asocierii, avand in vedere informatiile de natura comerciala din \u201c<strong>Studiul de prefezabilitate<\/strong> <strong>privind proiectul Reactoarelor Modulare Mici (SMR) aliniat <\/strong><strong>l<\/strong><strong>a cerin\u021bele enumerate \u00een HG nr. 907\/2016 privind etapele de elaborare \u0219i con\u021binutul-cadru al documenta\u021biilor tehnico-economice aferente obiectivelor\/proiectelor de investi\u021bii finan\u021bate din fonduri publice, Anexa 3<\/strong><strong>, <\/strong>cu exceptia informatiilor referitoare la valoarea costurilor estimate de investitie de tip CAPEX din Tabelul 3.6-1 de la Capitolul 3.5 al studiului, respectiv a paragrafelor referitoare la valoarea parametrilor de intrare (tip OPEX) si la premizele necesare pentru calculul indicatorilor de eficienta de la Capitolul 3.7.4 al studiului, SNN a decis, conform notei de informare de la punctul 2 de pe ordinea de zi\u00a0 a AGOA,\u00a0 in conditiile legislatiei aplicable dreptului actionarilor de a avea acces la informa\u0163ii suficiente despre problemele supuse aprobarii AGA,\u00a0 in spiritul transparentei, bunei credinte si bunelor practici, sa le ofere posibilitatea actionarilor, cu \u00eendeplinirea cerin\u0163elor de identificare prev\u0103zute in Convocatorul AGA, respectiv cerinta de a detine calitatea de actionar la data de referinta 05.04.2024, sa emita o cerere in acest sens insotita de Acordul de confidentialitate <strong>(<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/AGOA-RO-NDA-STUDIU-SMR.docx\">link<\/a>)<\/strong> completat si o copie CI pentru a primi acces la <strong>Studiul de prefezabilitate<\/strong> <strong>privind proiectul Reactoarelor Modulare Mici (SMR) aliniat Ia cerin\u021bele enumerate \u00een HG nr. 907\/2016 privind etapele de elaborare \u0219i con\u021binutul-cadru al documenta\u021biilor tehnico-economice aferente obiectivelor\/proiectelor de investi\u021bii finan\u021bate din fonduri publice, Anexa 3<\/strong><strong>, <\/strong>cu exceptia informatiilor referitoare la valoarea costurilor estimate de investitie de tip CAPEX din Tabelul 3.6-1 de la Capitolul 3.5 al studiului, respectiv a paragrafelor referitoare la valoarea parametrilor de intrare (tip OPEX) si la premizele necesare pentru calculul indicatorilor de eficienta de la Capitolul 3.7.4 al studiului.<\/p>\n<p>Mentionam ca studiul de prefezabilitate vine sa sprijine continuarea proiectului cu Reactoare Modulare Mici (SMR) fiind intocmit in conformitate cu HG 907\/2016, analiza banzandu-se in principal pe evaluari tehnice preliminare urmand ca pe parcursul etapei urmatoare a proiectului sa fie intocmit studiul de fezabilitate. Studiul si implicit recomandarile formulate in cadrul acestuia, printre care si cele cu privire la economicitatea proiectului, vor constitui baza emiterii Deciziei Finale de Investitie si vor fi prezentate, in spiritul transparentei, bunei credinte si bunelor practici, in conditiile legislatiei aplicabile dreptului actionarilor de a avea acces la informatii suficiente despre subiectele supuse aprobarii AGA la acel moment.<\/p>\n<p>SNN va efectua verificarea detinerii calitatii de membru la data de 05.04.2024 in registrul actionarilor transmis de Depozitarul Central si va pune la dispozitie <strong>Studiul de prefezabilitate<\/strong> <strong>privind proiectul Reactoarelor Modulare Mici (SMR) aliniat Ia cerin\u021bele enumerate \u00een HG nr. 907\/2016 privind etapele de elaborare \u0219i con\u021binutul-cadru al documenta\u021biilor tehnico-economice aferente obiectivelor\/proiectelor de investi\u021bii finan\u021bate din fonduri publice, Anexa 3, <\/strong>cu exceptia informatiilor referitoare la valoarea costurilor estimate de investitie de tip CAPEX din Tabelul 3.6-1 de la Capitolul 3.5 al studiului, respectiv a paragrafelor referitoare la valoarea parametrilor de intrare (tip OPEX) si la premizele necesare pentru calculul indicatorilor de eficienta de la Capitolul 3.7.4 al studiului.<\/p>\n<p>Cererile, insotite de angajamentul de confidentialitate semnat si copia CI vor fi transmise in atentia Consiliului de Administratie al SNN, fie in format fizic prin depunerea la Registratura SNN, din Bulevardul Iancu de Hunedoara, nr. 48, sector 1, Bucuresti, in intervalul orar 08:00 \u2013 16:00, fie prin trimiterea online, cu semnatura electronica extinsa incorporata conform Legii nr. 455\/2001 la adresa de email\u00a0<a href=\"https:\/\/mail.nuclearelectrica.ro\/owa\/redir.aspx?C=9euT_PqWkO49upnCvBdPMT-inkve_6FA_S2UYTT4z957OEusqOzVCA..&amp;URL=mailto%3aaga%40nuclearelectrica.ro\">aga@nuclearelectrica.ro<\/a>\u00a0cu tiltul \u201cSolicitare de furnizare documente AGOA 17.04.2024\u201d.<\/p>\n<p>Copia <strong>Studiul de prefezabilitate<\/strong> <strong>privind proiectul Reactoarelor Modulare Mici (SMR) aliniat Ia cerin\u021bele enumerate \u00een HG nr. 907\/2016 privind etapele de elaborare \u0219i con\u021binutul-cadru al documenta\u021biilor tehnico-economice aferente obiectivelor\/proiectelor de investi\u021bii finan\u021bate din fonduri publice, Anexa 3<\/strong> cu exceptia informatiilor referitoare la valoarea costurilor estimate de investitie de tip CAPEX din Tabelul 3.6-1 de la Capitolul 3.5 al studiului, respectiv a paragrafelor referitoare la valoarea parametrilor de intrare (tip OPEX) si la premizele necesare pentru calculul indicatorilor de eficienta de la Capitolul 3.7.4 al studiului, va fi pusa la dispozitie spre ridicare de la Registratura SNN din Bulevardul Iancu de Hunedoara nr. 48, sector 1, Bucuresti, in intervalul orar 08:00 \u2013 16:00 pentru solicitarile primite in format fizic si electronic, prin trimitere pe email, cu semnatura electronica SNN incorporata, pentru solicitarile primite pe email.<\/p>\n<h1>Adunarea Generala Extraordinara a Actionarilor<\/h1>\n<p><strong>Punctul 2: Aprobarea<\/strong> \u00eenfiin\u021b\u0103rii unui punct de lucru la Societatea Na\u021bional\u0103 \u201dNuclearelectrica\u201d A \u00een sat R\u0103scole\u0219ti, comuna Izvorul B\u00e2rzii, Calea T\u00e2rgul Jiului, km7, jude\u021bul Mehedin\u021bi, Cl\u0103dire pavilion administrativ, etaj 3, camera nr.3.<\/p>\n<p><strong>Punctul 3 Mandatarea<\/strong> Consiliului de Administra\u021bie al SNN s\u0103 \u00eendeplineasc\u0103 toate formalit\u0103\u021biile de \u00eenfiin\u021bare a punctului de lucru, cu posibilitatea deleg\u0103rii oric\u0103rei alte persoane care va fi desemnat\u0103, \u00een aceast\u0103 calitate, prin decizie a Consiliului de Administra\u021bie al SNN.<\/p>\n<p><strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/2024.03.27_Nota-AGA-SNN-infiintare-punct-de-lucru-Mehedinti_final.pdf\">Nota pentru punctele 2 si 3\u00a0<\/a><\/strong><\/p>\n<p><strong>Punctul 4:<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/20231113_Procedura-constituire-societati-cu-capital-mixt_extern_Final_post-CA-1.pdf\">Aprobarea<\/a><\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/20231113_Procedura-constituire-societati-cu-capital-mixt_extern_Final_post-CA-1.pdf\"> \u00eencheierii unui parteneriat direct cu DSPE BETA PRIVATE EQUITY FUND \u00een calitate de investitor \u00een compania de proiect RoPower Nuclear S.A \u00een baza prevederilor art.5.3 din Procedura SNN privind constituirea societ\u0103\u021biilor cu capital mixt emis\u0103 \u00een baza prevederilor ordinului ME nr.1180\/04.11.2021.<\/a><\/p>\n<p><strong>Punctul 5 :Aprobarea<\/strong> acordului tripartit al Ac\u021bionarilor\/Investitoriilor (SHA), ce urmeaz\u0103 a fi \u00eencheiat \u00eentre SNN, NOVA POWER and GAS SRL \u0219i DSPE BETA PRIVATE EQUITY FUND pentru dezvoltarea Proiectului SMR, \u00een Doice\u0219ti Rom\u00e2nia, \u00een forma negociat\u0103 \u00eentre SNN \u0219i Parteneri din Proiect.<\/p>\n<p><strong>Punctul 11: Aprobarea <\/strong>mandat\u0103rii reprezentantului SNN \u00een Adunarea General\u0103 a Ac\u021bionarilor Societ\u0103\u021bii RoPower Nuclear S.A., la data\/datele la care aceasta se va convoca, sedin\u021ba care va avea \u00eenscrise pe ordinea de zi punctele ce vor fi detaliate \u00een continuare, s\u0103 participe \u0219i s\u0103 voteze \u00een favoarea (\u201dpentru\u201d) urm\u0103toarele:<\/p>\n<p><strong>i. Aprobarea <\/strong>\u00eencheierii Contractului FEED Faza 2 Offshore;<\/p>\n<p><strong>ii. Aprobarea<\/strong> \u00eencheierii Contractului FEED Faza 2 Onshore;<\/p>\n<p><strong>iii. Aprobarea<\/strong> \u00eencheierii Contractului de Licen\u021b\u0103 Tehnologic\u0103;<\/p>\n<p><strong>iv. Aprobarea<\/strong> major\u0103rii plafonului \u00eemprumutului acordat de SNN \u00een temeiul Contractului Cadru de \u00eemprumut nr.1 din data de 16.08.2023 p\u00e2n\u0103 la concuren\u021ba sumei de 243,000,000 USD, \u0219i \u00eencheierea Actului adi\u021bional nr.2 la Contractul Cadru de \u00eemprumut nr.1 din data de 16.08.2023, cu men\u021biunea ca accesarea acestui \u00eemprumut se va face de c\u0103tre Societatea Ro Power Nuclear S.A numai \u00een m\u0103sura \u00een care nu se va putea asigura finan\u021barea Proiectului din alte surse (capital social, generat prin modificarea structurii ac\u021bionariatului RPN, sau \u00eemprumuturi\/credite bancare sau alte surse de finan\u021bare) \u0219i, oricum, numai p\u00e2n\u0103 la identificarea unor astfel de alte surse de finan\u021bare;<\/p>\n<p><strong>v. Aprobarea<\/strong> \u00eencheierii Actului Adi\u021bional nr.2 la Contractul de Ipotec\u0103 Mobiliar\u0103 \u00eencheiat cu SNN;<\/p>\n<p><strong>vi. Aprobarea<\/strong> mandat\u0103rii Pre\u0219edintelui Consiliului de Administra\u021bie \u0219i\/sau Directorului General al societ\u0103\u021bii s\u0103 semneze, \u00een numele \u0219i pe seama Societ\u0103\u021bii RoPower Nuclear S.A., contractele men\u021bionate la lit. i)- iii);<\/p>\n<p><strong>vii. Aprobarea<\/strong> mandat\u0103rii Directorului General al Societ\u0103\u021bii s\u0103 semneze, \u00een numele \u0219i pe seama societ\u0103\u021bii RoPower Nuclear S.A., contractele men\u021bionate la lit. iv)-v);<\/p>\n<p><strong>viii. Aprobarea<\/strong> \u00cemputernicirii Directorului General al Societ\u0103\u021bii RoPower Nuclear S.A., cu posibilitatea de sub-delegare, pentru \u00eendeplinirea oric\u0103rui act sau formalitate cerut\u0103 de lege pentru aducerea la \u00eendeplinire a hot\u0103r\u00e2rilor adoptate \u00een acest sens, inclusiv \u00een ceea ce prive\u0219te \u00eenregistrarea \u0219i publicarea acestora la Oficiul Registrului Comer\u021bului sau la orice alt\u0103 institu\u021bie public\u0103.<\/p>\n<p>&nbsp;<\/p>\n<p>Pentru protejarea intereselor sale comerciale legitime, precum si cele ale Asocierii, avand in vedere informatiile de natura comerciala din:<\/p>\n<p><strong>a) Acordul tripartit al Actionarilor\/Investitorilor (\u201cSHA\u201d)<\/strong>, ce urmeaza a fi incheiat intre SNN, Nova Power and Gas SRL si DSPE BETA PRIVATE EQUITY FUND pentru dezvoltarea Proiectului SMR, in Doicesti, Romania, in forma negociata intre SNN si Partenerii din Proiect;<\/p>\n<p><strong>b)Contractele FEED Faza 2<\/strong> (\u201cOffshore\u201d, respectiv \u201cOnshore\u201d)<strong>,<\/strong> cu exceptia informatiilor referitoare la:<\/p>\n<ul>\n<li>10.2 <strong>\u201cContractor\u2019s IP and Third-Party IP\u201d<\/strong>, respectiv <strong>Cap. 10.2.1<\/strong> si <strong>Cap.<\/strong> <strong>10.2.2<\/strong> privind drepturile de proprietate intelectuala ale contractorului, respectiv ale unei parti terte;<\/li>\n<li>10.4 <strong>\u201cOwner Furnished Information\u201d, <\/strong>privind dreptul de proprietate si retentie asupra anumitor informatii si materiale;<\/li>\n<li>11.1.3 <strong>\u201cWarranty of Accuracy of FEED Phase 1 Deliverables\u201d<\/strong>, privind termenii si conditiile referitoare la garantia de buna executie a livrabilelor din FEED Faza 1;<\/li>\n<li>14.3.1 <strong>\u201cTermination for Convenience by Owner\u201d<\/strong>, privind circumstantierea drepturilor si a mecanismului de terminare a contractului;<\/li>\n<li>19.1 <strong>\u201cChange in Control of NuScale\u201d<\/strong>, respectiv <strong>Cap. 19.2 \u201cChange in Control of Any Other Subcontractor\u201d<\/strong>, privind anumite modificari in structura actionariatului sau a conducerii NuScale, respectiv a sub-contractorilor (altii decat NuScale) angajati in dezvoltarea Proiectului;<\/li>\n<li>Definitia si interpretarea termenilor privind evenimentele de abandonare a Proiectului de catre NuScale, respectiv definitia si interpretarea termenului de Proprietate Intelectuala a NuScale din Anexa<strong> \u201cSchedule A Definitions and Interpretation Part 1\u201d;<\/strong><\/li>\n<li>Anexa \u201c<strong>Schedule B FEED Phase 2 Services<\/strong>\u201d care prezinta in detaliu serviciile de proiectare si inginerie aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule C Contractor Deliverables<\/strong>\u201d care prezinta la un nivel de detaliu avansat toate livrabilele si activitatile intreprinse de contractor pentru derularea etapei FEED Faza 2;<\/li>\n<li>Informatiile privind defalcarea costurilor si prezentarea anumitor activitati sau informatii incluse in anexa <strong>\u201cSchedule D1 Milestone Table\u201d<\/strong>, anexa <strong>\u201cSchedule D2 Commercials\u201d<\/strong>, respectiv anexa <strong>\u201cSchedule D3 Project Objectives and Structure\u201d<\/strong>;<\/li>\n<li>Anexa \u201c<strong>Schedule E1 Parent Company Guarantee\u201d<\/strong> care prezinta in detaliu mecanismul contractual care guverneaza garantia companiei \u201cmama\u201d in cazul contractorului;<\/li>\n<li>Anexa \u201c<strong>Schedule E2 Form of Performance Bond<\/strong>\u201d care prezinta in detaliu mecanismul contractual prin care este prevazuta garantia de executie a contractului FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule F<\/strong> <strong>Form of Variation Order<\/strong>\u201d care prevede procedura prin care este avuta in vedere definirea unui process de adresare a unor posibile variatii in contractul FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule G Form of Contractor Invoice<\/strong>\u201d care prevede procesul de facturare pentru indeplinirea livrabilelor aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule H Codes and Standards<\/strong>\u201d care prezinta in detaliu standardele si normele utilizate in executarea serviciilor aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule I Deliverable Schedule<\/strong>\u201d care prezinta in detaliu calendarul de receptionare a livrabilelor aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule J Approved Subcontractors<\/strong>\u201d care prezinta lista cu subcontractorii implicati in derularea etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule K Contractor Permits Licenses<\/strong>\u201d care contine lista certificatelor si autorizatii obtinute de catre Contractor in vederea prestarii de servicii aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule L Insurance Document<\/strong>\u201d privind lista asigurarilor acoperitoare contractelor de proiectare si inginerie aferente FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule M Key Personnel<\/strong>\u201d care prezinta in detaliu CV-ul personalului cheie, reprezentat prin directoratul pentru etapa FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule N Procurement<\/strong>\u201d care prezinta procedurile de achizitie ce urmeaza a fi utilizate in executia etapei FEED Faza 2;<\/li>\n<li>Anexa \u201cSchedule O1 20 Days Review Process by RoPower\u201d care prezinta in detaliu lista livrabilelor cu termen de analiza de catre Ropower de 20 zile;<\/li>\n<li>Anexa \u201c<strong>Schedule O2 20 Days Review Process by RoPower &amp; Authorities<\/strong>\u201d care prezinta in detaliu lista livrabilelor cu termen de analiza de catre Ropower si autoritati de 20 zile;<\/li>\n<li>Anexa \u201c<strong>Schedule O3 10 Days Review Process<\/strong>\u201d care prezinta in detaliu lista livrabilelor cu termen de analiza de 10 zile;<\/li>\n<li>Anexa \u201c<strong>Schedule O4 2 Days Review Proces by RoPower<\/strong>\u201d care prezinta in detaliu lista livrabilelor cu termen de analiza de catre RoPower de 2 zile;<\/li>\n<li>Anexa \u201c<strong>Schedule P Rely Upon Information<\/strong>\u201d care prezinta lista unor informatii de referinta (precum Livrabilele din FEED Faza 2, Documentatia Baza de Licentiere, Livrabilele NuScale stipulate in baza Acordului de Licenta Tehnologica, dar si alte informatii de ordin tehnic) in baza carora se vor executa anumite activitati ale contractului;<\/li>\n<li>Anexa \u201c<strong>Schedule Q Summary of Activities (HG907\/2016)<\/strong>\u201d care prezinta diviziunea responsabilitatilor in vederea derularii activitatilor necesare pentru indeplinirea prevederilor legale pentru documentatii tip studii de fezabilitate;<\/li>\n<li>Anexa \u201c<strong>Schedule R Form of Weekly &amp; Monthly Progress Report<\/strong>\u201d care prezinta structura rapoartelor recurente pentru monitorizarea evolutiei Proiectului pe parcursul etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule S Final Acceptance Certificate<\/strong>\u201d care prezinta modelul certificatului de acceptanta a livrabilelor prestate in etapa FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule T Priority Deliverables<\/strong>\u201d care prezinta lista livrabilelor prioritare aferente etapei FEED Faza 2, respectiv termenele contractuale asumate pentru acestea;<\/li>\n<li>Anexa \u201c<strong>Schedule U Liquidated Damages<\/strong>\u201d care prezinta lista penalitatilor si mecanismul de penalizare aplicabil livrabilelor prioritare aferente etapei FEED Faza 2.<\/li>\n<\/ul>\n<p>Mentionam ca ambele contracte FEED 2 \u201cOffshore\u201d si \u201cOnshore\u201d impart aceleasi anexe.<\/p>\n<p><strong>c) Contractul de<\/strong> <strong>Licenta Tehnologica<\/strong> (\u201cTLA\u201d), cu exceptia informatiilor referitoare la anexa <strong>\u201cExhibit A Licensed Technology<\/strong>\u201d, respectiv anexa <strong>\u201cExhibit B Form of NuScale Invoice\u201d;<\/strong><\/p>\n<p><strong>d) Actul Aditional nr. 2<\/strong> la contractul cadru de imprumut nr. 1 din data de 16.08.2023, cu exceptia anumitor informatii din Art. 2.1 referitoare la cuantumul deja utilizat de catre Imprumutat;<\/p>\n<p><strong>e) Actul Aditional nr. 2<\/strong> la contractul de ipoteca mobiliara, cu exceptia anumitor informatii din Art. 1.1 referitoare la prevederile ipotecii mobiliare<\/p>\n<p>SNN a decis in conditiile legislatiei aplicable dreptului actionarilor de a avea acces la informa\u0163ii suficiente despre problemele supuse aprobarii AGA,\u00a0 in spiritul transparentei, bunei credinte si bunelor practici, sa le ofere posibilitatea actionarilor, cu \u00eendeplinirea cerin\u0163elor de identificare prev\u0103zute in Convocatorul AGA, respectiv cerinta de a detine calitatea de actionar la data de referinta 05.04.2024, sa emita o cerere in acest sens insotita de Acordul de confidentialitate <strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/RO-NDA-Proj-SMR.docx\">(link)<\/a><\/strong> completat si o copie CI pentru a primi acces la urmatoarele:<\/p>\n<p><strong>a) Acordul tripartit al Actionarilor\/Investitorilor (\u201cSHA\u201d)<\/strong>, ce urmeaza a fi incheiat intre SNN, Nova Power and Gas SRL si DSPE BETA PRIVATE EQUITY FUND pentru dezvoltarea Proiectului SMR, in Doicesti, Romania, in forma negociata intre SNN si Partenerii din Proiect;<\/p>\n<p><strong>b) Contractele FEED Faza 2<\/strong> (\u201cOffshore\u201d, respectiv \u201cOnshore\u201d)<strong>,<\/strong> cu exceptia informatiilor referitoare la:<\/p>\n<ul>\n<li>10.2 <strong>\u201cContractor\u2019s IP and Third-Party IP\u201d<\/strong>, respectiv <strong>Cap. 10.2.1<\/strong> si <strong>Cap.<\/strong> <strong>10.2.2<\/strong> privind drepturile de proprietate intelectuala ale contractorului, respectiv ale unei parti terte;<\/li>\n<li>10.4 <strong>\u201cOwner Furnished Information\u201d, <\/strong>privind dreptul de proprietate si retentie asupra anumitor informatii si materiale;<\/li>\n<li>11.1.3 <strong>\u201cWarranty of Accuracy of FEED Phase 1 Deliverables\u201d<\/strong>, privind termenii si conditiile referitoare la garantia de buna executie a livrabilelor din FEED Faza 1;<\/li>\n<li>14.3.1 <strong>\u201cTermination for Convenience by Owner\u201d<\/strong>, privind circumstantierea drepturilor si a mecanismului de terminare a contractului;<\/li>\n<li>19.1 <strong>\u201cChange in Control of NuScale\u201d<\/strong>, respectiv <strong>Cap. 19.2 \u201cChange in Control of Any Other Subcontractor\u201d<\/strong>, privind anumite modificari in structura actionariatului sau a conducerii NuScale, respectiv a sub-contractorilor (altii decat NuScale) angajati in dezvoltarea Proiectului;<\/li>\n<li>Definitia si interpretarea termenilor privind evenimentele de abandonare a Proiectului de catre NuScale, respectiv definitia si interpretarea termenului de Proprietate Intelectuala a NuScale din Anexa<strong> \u201cSchedule A Definitions and Interpretation Part 1\u201d;<\/strong><\/li>\n<li>Anexa \u201c<strong>Schedule B FEED Phase 2 Services<\/strong>\u201d care prezinta in detaliu serviciile de proiectare si inginerie aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule C Contractor Deliverables<\/strong>\u201d care prezinta la un nivel de detaliu avansat toate livrabilele si activitatile intreprinse de contractor pentru derularea etapei FEED Faza 2;<\/li>\n<li>Informatiile privind defalcarea costurilor si prezentarea anumitor activitati sau informatii incluse in anexa <strong>\u201cSchedule D1 Milestone Table\u201d<\/strong>, anexa <strong>\u201cSchedule D2 Commercials\u201d<\/strong>, respectiv anexa <strong>\u201cSchedule D3 Project Objectives and Structure\u201d<\/strong>;<\/li>\n<li>Anexa \u201c<strong>Schedule E1 Parent Company Guarantee\u201d<\/strong> care prezinta in detaliu mecanismul contractual care guverneaza garantia companiei \u201cmama\u201d in cazul contractorului;<\/li>\n<li>Anexa \u201c<strong>Schedule E2 Form of Performance Bond<\/strong>\u201d care prezinta in detaliu mecanismul contractual prin care este prevazuta garantia de executie a contractului FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule F<\/strong> <strong>Form of Variation Order<\/strong>\u201d care prevede procedura prin care este avuta in vedere definirea unui process de adresare a unor posibile variatii in contractul FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule G Form of Contractor Invoice<\/strong>\u201d care prevede procesul de facturare pentru indeplinirea livrabilelor aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule H Codes and Standards<\/strong>\u201d care prezinta in detaliu standardele si normele utilizate in executarea serviciilor aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule I Deliverable Schedule<\/strong>\u201d care prezinta in detaliu calendarul de receptionare a livrabilelor aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule J Approved Subcontractors<\/strong>\u201d care prezinta lista cu subcontractorii implicati in derularea etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule K Contractor Permits Licenses<\/strong>\u201d care contine lista certificatelor si autorizatii obtinute de catre Contractor in vederea prestarii de servicii aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule L Insurance Document<\/strong>\u201d privind lista asigurarilor acoperitoare contractelor de proiectare si inginerie aferente FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule M Key Personnel<\/strong>\u201d care prezinta in detaliu CV-ul personalului cheie, reprezentat prin directoratul pentru etapa FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule N Procurement<\/strong>\u201d care prezinta procedurile de achizitie ce urmeaza a fi utilizate in executia etapei FEED Faza 2;<\/li>\n<li>Anexa \u201cSchedule O1 20 Days Review Process by RoPower\u201d care prezinta in detaliu lista livrabilelor cu termen de analiza de catre Ropower de 20 zile;<\/li>\n<li>Anexa \u201c<strong>Schedule O2 20 Days Review Process by RoPower &amp; Authorities<\/strong>\u201d care prezinta in detaliu lista livrabilelor cu termen de analiza de catre Ropower si autoritati de 20 zile;<\/li>\n<li>Anexa \u201c<strong>Schedule O3 10 Days Review Process<\/strong>\u201d care prezinta in detaliu lista livrabilelor cu termen de analiza de 10 zile;<\/li>\n<li>Anexa \u201c<strong>Schedule O4 2 Days Review Proces by RoPower<\/strong>\u201d care prezinta in detaliu lista livrabilelor cu termen de analiza de catre RoPower de 2 zile;<\/li>\n<li>Anexa \u201c<strong>Schedule P Rely Upon Information<\/strong>\u201d care prezinta lista unor informatii de referinta (precum Livrabilele din FEED Faza 2, Documentatia Baza de Licentiere, Livrabilele NuScale stipulate in baza Acordului de Licenta Tehnologica, dar si alte informatii de ordin tehnic) in baza carora se vor executa anumite activitati ale contractului;<\/li>\n<li>Anexa \u201c<strong>Schedule Q Summary of Activities (HG907\/2016)<\/strong>\u201d care prezinta diviziunea responsabilitatilor in vederea derularii activitatilor necesare pentru indeplinirea prevederilor legale pentru documentatii tip studii de fezabilitate;<\/li>\n<li>Anexa \u201c<strong>Schedule R Form of Weekly &amp; Monthly Progress Report<\/strong>\u201d care prezinta structura rapoartelor recurente pentru monitorizarea evolutiei Proiectului pe parcursul etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule S Final Acceptance Certificate<\/strong>\u201d care prezinta modelul certificatului de acceptanta a livrabilelor prestate in etapa FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule T Priority Deliverables<\/strong>\u201d care prezinta lista livrabilelor prioritare aferente etapei FEED Faza 2, respectiv termenele contractuale asumate pentru acestea;<\/li>\n<li>Anexa \u201c<strong>Schedule U Liquidated Damages<\/strong>\u201d care prezinta lista penalitatilor si mecanismul de penalizare aplicabil livrabilelor prioritare aferente etapei FEED Faza 2.<\/li>\n<\/ul>\n<p>Mentionam ca ambele contracte FEED 2 \u201cOffshore\u201d si \u201cOnshore\u201d impart aceleasi anexe.<\/p>\n<p><strong>c) Contractul<\/strong> <strong>de<\/strong> <strong>Licenta Tehnologica<\/strong> (\u201cTLA\u201d), cu exceptia informatiilor referitoare la anexa <strong>\u201cExhibit A Licensed Technology<\/strong>\u201d, respectiv anexa <strong>\u201cExhibit B Form of NuScale Invoice\u201d;<\/strong><\/p>\n<p><strong>d) Actul Aditional nr. 2<\/strong> la contractul cadru de imprumut nr. 1 din data de 16.08.2023, cu exceptia anumitor informatii din Art. 2.1 referitoare la cuantumul deja utilizat de catre Imprumutat;<\/p>\n<p><strong>e) Actul Aditional nr. 2<\/strong> la contractul de ipoteca mobiliara, cu exceptia anumitor informatii din Art. 1.1 referitoare la prevederile ipotecii mobiliare<\/p>\n<p>Mentionam faptul ca, in perspectiva continuitatii Proiectului Reactoarelor Modulare Mici (SMR), este avuta in vedere negocierea mecanismelor contractuale necesare pentru derularea etapei FEED Faza 2, avand la baza toate activitatile care vor fi intreprinse pentru atingerea obiectivelor, in vedere emiterii unei Decizii Finale de Investitie la incheierea acestei etape. Livrabilele rezultate din FEED Faza 2 vor constitui baza emiterii Deciziei Finale de Investitie si vor fi prezentate, in spiritul transparentei, bunei credinte si bunelor practice, in conditiile legislatiei aplicabile, dreptului actionarilor de a avea acces la informatii suficiente despre subiectele supuse aprobarii AGA la acel moment.<\/p>\n<p>SNN va efectua verificarea detinerii calitatii de membru la data de 05.04.2024 in registrul actionarilor transmis de Depozitarul Central si va pune la dispozitie <strong>urmatoarele:<\/strong><\/p>\n<p><strong>a) Acordul tripartit al Actionarilor\/Investitorilor (\u201cSHA\u201d)<\/strong>, ce urmeaza a fi incheiat intre SNN, Nova Power and Gas SRL si DSPE BETA PRIVATE EQUITY FUND pentru dezvoltarea Proiectului SMR, in Doicesti, Romania, in forma negociata intre SNN si Partenerii din Proiect;<\/p>\n<p><strong>b) Contractele FEED Faza 2<\/strong> (\u201cOffshore\u201d, respectiv \u201cOnshore\u201d)<strong>,<\/strong> cu exceptia informatiilor referitoare la:<\/p>\n<ul>\n<li>10.2 <strong>\u201cContractor\u2019s IP and Third-Party IP\u201d<\/strong>, respectiv <strong>Cap. 10.2.1<\/strong> si <strong>Cap.<\/strong> <strong>10.2.2<\/strong> privind drepturile de proprietate intelectuala ale contractorului, respectiv ale unei parti terte;<\/li>\n<li>10.4 <strong>\u201cOwner Furnished Information\u201d, <\/strong>privind dreptul de proprietate si retentie asupra anumitor informatii si materiale;<\/li>\n<li>11.1.3 <strong>\u201cWarranty of Accuracy of FEED Phase 1 Deliverables\u201d<\/strong>, privind termenii si conditiile referitoare la garantia de buna executie a livrabilelor din FEED Faza 1;<\/li>\n<li>14.3.1 <strong>\u201cTermination for Convenience by Owner\u201d<\/strong>, privind circumstantierea drepturilor si a mecanismului de terminare a contractului;<\/li>\n<li>19.1 <strong>\u201cChange in Control of NuScale\u201d<\/strong>, respectiv <strong>Cap. 19.2 \u201cChange in Control of Any Other Subcontractor\u201d<\/strong>, privind anumite modificari in structura actionariatului sau a conducerii NuScale, respectiv a sub-contractorilor (altii decat NuScale) angajati in dezvoltarea Proiectului;<\/li>\n<li>Definitia si interpretarea termenilor privind evenimentele de abandonare a Proiectului de catre NuScale, respectiv definitia si interpretarea termenului de Proprietate Intelectuala a NuScale din Anexa<strong> \u201cSchedule A Definitions and Interpretation Part 1\u201d;<\/strong><\/li>\n<li>Anexa \u201c<strong>Schedule B FEED Phase 2 Services<\/strong>\u201d care prezinta in detaliu serviciile de proiectare si inginerie aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule C Contractor Deliverables<\/strong>\u201d care prezinta la un nivel de detaliu avansat toate livrabilele si activitatile intreprinse de contractor pentru derularea etapei FEED Faza 2;<\/li>\n<li>Informatiile privind defalcarea costurilor si prezentarea anumitor activitati sau informatii incluse in anexa <strong>\u201cSchedule D1 Milestone Table\u201d<\/strong>, anexa <strong>\u201cSchedule D2 Commercials\u201d<\/strong>, respectiv anexa <strong>\u201cSchedule D3 Project Objectives and Structure\u201d<\/strong>;<\/li>\n<li>Anexa \u201c<strong>Schedule E1 Parent Company Guarantee\u201d<\/strong> care prezinta in detaliu mecanismul contractual care guverneaza garantia companiei \u201cmama\u201d in cazul contractorului;<\/li>\n<li>Anexa \u201c<strong>Schedule E2 Form of Performance Bond<\/strong>\u201d care prezinta in detaliu mecanismul contractual prin care este prevazuta garantia de executie a contractului FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule F<\/strong> <strong>Form of Variation Order<\/strong>\u201d care prevede procedura prin care este avuta in vedere definirea unui process de adresare a unor posibile variatii in contractul FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule G Form of Contractor Invoice<\/strong>\u201d care prevede procesul de facturare pentru indeplinirea livrabilelor aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule H Codes and Standards<\/strong>\u201d care prezinta in detaliu standardele si normele utilizate in executarea serviciilor aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule I Deliverable Schedule<\/strong>\u201d care prezinta in detaliu calendarul de receptionare a livrabilelor aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule J Approved Subcontractors<\/strong>\u201d care prezinta lista cu subcontractorii implicati in derularea etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule K Contractor Permits Licenses<\/strong>\u201d care contine lista certificatelor si autorizatii obtinute de catre Contractor in vederea prestarii de servicii aferente etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule L Insurance Document<\/strong>\u201d privind lista asigurarilor acoperitoare contractelor de proiectare si inginerie aferente FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule M Key Personnel<\/strong>\u201d care prezinta in detaliu CV-ul personalului cheie, reprezentat prin directoratul pentru etapa FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule N Procurement<\/strong>\u201d care prezinta procedurile de achizitie ce urmeaza a fi utilizate in executia etapei FEED Faza 2;<\/li>\n<li>Anexa \u201cSchedule O1 20 Days Review Process by RoPower\u201d care prezinta in detaliu lista livrabilelor cu termen de analiza de catre Ropower de 20 zile;<\/li>\n<li>Anexa \u201c<strong>Schedule O2 20 Days Review Process by RoPower &amp; Authorities<\/strong>\u201d care prezinta in detaliu lista livrabilelor cu termen de analiza de catre Ropower si autoritati de 20 zile;<\/li>\n<li>Anexa \u201c<strong>Schedule O3 10 Days Review Process<\/strong>\u201d care prezinta in detaliu lista livrabilelor cu termen de analiza de 10 zile;<\/li>\n<li>Anexa \u201c<strong>Schedule O4 2 Days Review Proces by RoPower<\/strong>\u201d care prezinta in detaliu lista livrabilelor cu termen de analiza de catre RoPower de 2 zile;<\/li>\n<li>Anexa \u201c<strong>Schedule P Rely Upon Information<\/strong>\u201d care prezinta lista unor informatii de referinta (precum Livrabilele din FEED Faza 2, Documentatia Baza de Licentiere, Livrabilele NuScale stipulate in baza Acordului de Licenta Tehnologica, dar si alte informatii de ordin tehnic) in baza carora se vor executa anumite activitati ale contractului;<\/li>\n<li>Anexa \u201c<strong>Schedule Q Summary of Activities (HG907\/2016)<\/strong>\u201d care prezinta diviziunea responsabilitatilor in vederea derularii activitatilor necesare pentru indeplinirea prevederilor legale pentru documentatii tip studii de fezabilitate;<\/li>\n<li>Anexa \u201c<strong>Schedule R Form of Weekly &amp; Monthly Progress Report<\/strong>\u201d care prezinta structura rapoartelor recurente pentru monitorizarea evolutiei Proiectului pe parcursul etapei FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule S Final Acceptance Certificate<\/strong>\u201d care prezinta modelul certificatului de acceptanta a livrabilelor prestate in etapa FEED Faza 2;<\/li>\n<li>Anexa \u201c<strong>Schedule T Priority Deliverables<\/strong>\u201d care prezinta lista livrabilelor prioritare aferente etapei FEED Faza 2, respectiv termenele contractuale asumate pentru acestea;<\/li>\n<li>Anexa \u201c<strong>Schedule U Liquidated Damages<\/strong>\u201d care prezinta lista penalitatilor si mecanismul de penalizare aplicabil livrabilelor prioritare aferente etapei FEED Faza 2.<\/li>\n<\/ul>\n<p>Mentionam ca ambele contracte FEED 2 \u201cOffshore\u201d si \u201cOnshore\u201d impart aceleasi anexe.<\/p>\n<p><strong>c) Contractul<\/strong> <strong>de<\/strong> <strong>Licenta Tehnologica<\/strong> (\u201cTLA\u201d), cu exceptia informatiilor referitoare la anexa <strong>\u201cExhibit A Licensed Technology<\/strong>\u201d, respectiv anexa <strong>\u201cExhibit B Form of NuScale Invoice\u201d;<\/strong><\/p>\n<p><strong>d) Actul Aditional nr. 2<\/strong> la contractul cadru de imprumut nr. 1 din data de 16.08.2023, cu exceptia anumitor informatii din Art. 2.1 referitoare la cuantumul deja utilizat de catre Imprumutat;<\/p>\n<p><strong>e) Actul Aditional nr. 2<\/strong> la contractul de ipoteca mobiliara, cu exceptia anumitor informatii din Art. 1.1 referitoare la prevederile ipotecii mobiliare<\/p>\n<p>Cererile, insotite de angajamentul de confidentialitate semnat si copia CI vor fi transmise in atentia Consiliului de Administratie al SNN, fie in format fizic prin depunerea la Registratura SNN, din Bulevardul Iancu de Hunedoara, nr. 48, sector 1, Bucuresti, in intervalul orar 08:00 \u2013 16:00, fie prin trimiterea online, cu semnatura electronica extinsa incorporata conform Legii nr. 455\/2001 la adresa de email\u00a0<a href=\"https:\/\/mail.nuclearelectrica.ro\/owa\/redir.aspx?C=9euT_PqWkO49upnCvBdPMT-inkve_6FA_S2UYTT4z957OEusqOzVCA..&amp;URL=mailto%3aaga%40nuclearelectrica.ro\">aga@nuclearelectrica.ro<\/a>\u00a0cu tiltul \u201cSolicitare de furnizare documente AGEA 17.04.2024\u201d.<\/p>\n<p>Copia <strong>contractelor enumerate la literele a) \u2013 e) mai sus<\/strong> vor fi puse la dispozitie spre ridicare de la Registratura SNN din Bulevardul Iancu de Hunedoara nr. 48, sector 1, Bucuresti, in intervalul orar 08:00 \u2013 16:00 pentru solicitarile primite in format fizic si electronic, prin trimitere pe email, cu semnatura electronica SNN incorporata, pentru solicitarile primite pe email.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Punctul 12:<\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/AGEA-PCT-2-SI-3-2024.03.06_Nota-AGA-aprobare-semnare-AA-la-Acordul-de-Sprijin.pdf\">Aprobarea Actului Aditional la Acordul de Sprijin intre Statul roman si SNN in legatura cu Proiectul Unitatile 3 \u015fi 4 CNE Cernavod\u0103, in forma prezentata actionarilor.<\/a><\/p>\n<p><strong>Punctul 13:<\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/AGEA-PCT-2-SI-3-2024.03.06_Nota-AGA-aprobare-semnare-AA-la-Acordul-de-Sprijin-1.pdf\">Mandatarea CA SNN pentru a aproba orice modificari la Actul Aditional la Acordul de Sprijin intre Statul roman si SNN in legatura cu Proiectul Unitatile 3 \u015fi 4 CNE Cernavod\u0103, modificari generate de dinamica procesului de negociere, prin raportare la forma de Act Aditional in forma prezentata actionarilor, precum si pentru a aproba forma finala a acestuia, respectiv forma incluzind modificarile rezultate din procesul de negociere.<\/a><\/p>\n<p>Anexa 1 &#8211;<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/AGEA-PCT-2-SI-3-Anexa-1_Act-aditional-la-Acord-de-sprijin-U3-si-4-actualizat-1.pdf\">Act Adi\u0163ional nr. 1 la Acordul de Sprijin dintre Statul rom\u00e2n \u0219i Societatea Na\u021bional\u0103 \u201eNuclearelectrica\u201d \u2014 S.A. (SNN) privind Proiectul Unit\u0103\u0163ilor 3 \u015fi 4 CNE Cernavod\u0103<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Adresa-ME-completare-OZ-17.04.2024.pdf\">Solicitare de completare a ordinii de zi a AGEA de la actionarul majoritar, Ministerul Energiei<\/a><\/strong><\/p>\n<h1>Imputerniciri generale<\/h1>\n<p>Imputernicire generala persoane fizice AGOA \u00a0\u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/SNN_imputernicire_generala_AGOA_persoane_fizice_RO.doc\">aici<\/a><\/p>\n<p>Imputernicire generala persoane juridice AGOA \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/SNN_imputernicire_generala_AGOA_persoane_juridice_RO.doc\">aici<\/a><\/p>\n<p>Imputernicire generala persoane fizice AGEA \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/SNN_imputernicire_generala_AGEA_persoane_fizice_RO.doc\">aici<\/a><\/p>\n<p>Imputernicire generala persoane juridice AGEA \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/SNN_imputernicire_generala_AGEA_persoane_juridice_RO-1.doc\">aici<\/a><\/p>\n<h1>Imputerniciri speciale<\/h1>\n<p>Imputernicire speciala persoane fizice AGOA\u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Imputernicire-special\u0103-pentru-actionari-persoane-fizice-AGOA-17.04.2024.docx\">aici<\/a><\/p>\n<p>Imputernicire speciala persoane juridice AGOA\u00a0 \u00a0\u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Imputernicire-speciala-pentru-actionari-persoane-juridice-AGOA-17.04.2024.docx\">aici<\/a><\/p>\n<p>Imputernicire speciala persoane fizice AGEA\u00a0 \u2013 click<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Imputernicire-speciala-pentru-actionari-persoane-fizice-AGEA-17.04.2024.docx\">\u00a0aici<\/a><\/p>\n<p>ORDINE DE ZI COMPLETATA: Imputernicire speciala persoane fizice AGEA\u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Imputernicire-speciala-pentru-actionari-persoane-fizice-AGEA-17.04.2024-actualizat.docx\">aici<\/a><\/p>\n<p>Imputernicire speciala persoane juridice AGEA\u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Imputernicire-speciala-pentru-actionari-persoane-juridice-AGEA-17.04.2024.docx\">aici<\/a><\/p>\n<p>ORDINE DE ZI COMPLETATA: Imputernicire speciala persoane juridice AGEA\u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Imputernicire-speciala-pentru-actionari-persoane-juridice-AGEA-17.04.2024-actualizat.docx\">aici<\/a><\/p>\n<h1>Buletine de vot prin corespondenta<\/h1>\n<p>Buletin de vot prin corespondenta actionari persoane fizice AGOA\u00a0 \u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/BVC-persoane-fizice-AGOA-17.04.2024.docx\">aici<\/a><\/p>\n<p>Buletin de vot prin corespondenta actionari persoane juridice AGOA\u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/BVC-persoane-juridice-AGOA-17.04.2024.docx\">aici<\/a><\/p>\n<p>Buletin de vot prin corespondenta actionari persoane fizice AGEA\u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/BVC-persoane-fizice-AGEA-17.04.2024.docx\">aici<\/a><\/p>\n<p>ORDINE DE ZI COMPLETATA: Buletin de vot prin corespondenta actionari persoane fizice AGEA\u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/BVC-persoane-fizice-AGEA-17.04.2024-actualizat.docx\">aici<\/a><\/p>\n<p>Buletin de vot prin corespondenta actionari persoane juridice AGEA \u2013 click<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/BVC-persoane-juridice-AGEA-17.04.2024.docx\">\u00a0aici<\/a><\/p>\n<p>ORDINE DE ZI COMPLETATA: Buletin de vot prin corespondenta actionari persoane juridice AGEA \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/BVC-persoane-juridice-AGEA-17.04.2024-actualizat.docx\">aici<\/a><\/p>\n<h1>Proiecte de hotarari<\/h1>\n<p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Proiect-HAGOA-SNN-17.04.2024-RO.doc\">Proiect hotarare AGOA<\/a><\/p>\n<p>ORDINE DE ZI COMPLETATA &#8211; <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Proiect-HAGOA-SNN-17.04.2024-RO-ACTUALIZAT.doc\">Proiect hotarare AGOA<\/a><\/p>\n<p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Proiect-HAGEA-SNN-17.04.2024-RO.docx\">Proiect hotarare AGEA<\/a><\/p>\n<p>ORDINE DE ZI COMPLETATA &#8211; <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/Proiect-HAGEA-SNN-17.04.2024-RO-actualizat.docx\">Proiect hotarare AGEA<\/a><\/p>\n<p>&nbsp;<\/p>\n<h1>Hotarari<\/h1>\n<p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/HAGOA-SNN-17.04.2024-RO-ACTUALIZAT.pdf\">Hotarare AGOA<\/a><\/p>\n<p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2024\/03\/HAGEA-SNN-17.04.2024-RO-actualizat.pdf\">Hotarare AGEA\u00a0<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Convocatorul Completat al Adunarii Generale Ordinare si Extraordinare a Actionarilor din data de 17.04.2024 Convocatorul Adunarii Generale Ordinare si Extraordinare\u00a0 a Actionarilor din data de 17.04.2024 Regulamentul privind organizarea si desfasurarea Adunarilor Generale ale Actionarilor SNN actualizat la nivelul lunii octombrie 2020 prin Decizia Consiliului de Administratie nr. 205\/15.10.2020 Adunarea Generala Ordinara a Actionarilor Punctul [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":906,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1230,364],"tags":[],"class_list":["post-41769","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2024-ro","category-informatii-referitoare-la-aga"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/posts\/41769","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/comments?post=41769"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/posts\/41769\/revisions"}],"predecessor-version":[{"id":44420,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/posts\/41769\/revisions\/44420"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/media?parent=41769"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/categories?post=41769"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/tags?post=41769"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}