{"id":47065,"date":"2025-07-25T15:19:55","date_gmt":"2025-07-25T15:19:55","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/ir\/?p=47065"},"modified":"2025-09-03T15:00:10","modified_gmt":"2025-09-03T15:00:10","slug":"03-09-2025","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/ir\/2025\/07\/25\/03-09-2025\/","title":{"rendered":"03.09.2025"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"47065\" class=\"elementor elementor-47065\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-706b973 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"706b973\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-6183a63 top column-style-top\" data-id=\"6183a63\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-8a26479 elementor-widget elementor-widget-text-editor\" data-id=\"8a26479\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/9\/2022\/01\/RO-REGULAMENT-AGA_SNN_-septembrie-2020-1.pdf\">Regulamentul privind organizarea si desfasurarea Adunarilor Generale ale Actionarilor SNN actualizat la nivelul lunii octombrie 2020 prin Decizia Consiliului de Administratie nr. 205\/15.10.2020<\/a><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/Convocator-AGA-3-septembrie-2025_4_vc_sm-Copy.pdf\">Convocatorul Adunarii Generale Ordinare\u00a0 si Extraordinare a Actionarilor pentru data de 03.09.2025<\/a><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/Convocator-completat-AGA-3-septembrie-2025.pdf\">Convocatorul completat al Adunarii Generale Ordinare si Extraordinare pentru data de 03.09.2025<\/a><\/p><h2>\u00a0<\/h2><h2><strong>Adunarea Generala Ordinara a Actionarilor<\/strong><\/h2><p><strong>Punctul 2 &#8211; Revocarea <\/strong>a 2 (doi) membri provizorii din cadrul Consiliului de Administratie ca urmare a incetarii duratei mandatului acestora, incepand cu data de 23 septembrie 2025 (vot secret).<\/p><p><strong>Punctul 3 &#8211; Alegerea<\/strong> a 2 (doi) membri provizorii, in cadrul Consiliului de Administratie ca urmare a vacantarii pozitiei la punctul de mai sus al ordinii de zi, incepand cu data de 24 septembrie 2025. (vot secret)<\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-ANEXA-4-.pdf\">Lista persoanelor propuse pentru functia de membru in Consiliul de Administratie\u00a0 SNN<\/a><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-CV-ARTUR-STRATAN.pdf\">Dan \u2013 Artur STRATAN\u00a0 CV<\/a><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-CV-MIHAI-DORIN-PENA-.pdf\">Mihai Dorin PENA\u00a0 CV<\/a><\/p><p><strong>Punctul 4 &#8211; Stabilirea<\/strong> duratei mandatului membrilor provizorii alesi la punctul mai sus mentionat, pentru o perioada de 2 luni, conform prevederilor OUG nr. 109\/2011 privind guvernanta corporativa a intreprinderilor publice, cu modificarile si completarile ulterioare.<\/p><p><strong>Punctul 5 &#8211; Stabilirea<\/strong> indemnizatiei fixe brute lunare a membrilor provizorii din cadrul Consiliului de Administratie alesi, in cuantumul stabilit in conformitate cu Hotararea Adunarii Generale Ordinare a Actionarilor nr 6\/10.08.2022.<\/p><p><strong>Punctul 6 &#8211; Aprobarea<\/strong> formei contractului de mandat ce va fi incheiat cu membri provizorii din cadrul Consiliului de Administratie alesi la punctul (3), in forma propusa de Ministerul Energiei. ANEXA 1.<\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-ANEXA-1-CONTRACT-DE-MANDAT.pdf\">ANEXA 1 Forma contractului de mandat propusa de Ministerul Energiei<\/a><\/p><p><strong>Punctul 7 &#8211; Mandatarea<\/strong> reprezentantului Ministerul Energiei in A.G.O.A. pentru a semna, in numele si pe seama Societatii, contractele de mandat cu membri provizorii din cadrul Consiliului de Administratie alesi la punctul (3).<\/p><p><strong>Punctul 8 &#8211; Prelungirea<\/strong> cu 2 luni a duratei mandatelor pentru 3 (trei) membri provizorii din cadrul Consiliului de Administratie. (vot secret)<\/p><p><strong>Punctul 9 &#8211; Aprobarea<\/strong> incheierii actelor aditionale la contractele de mandat privind prelungirea cu 2 (doua) luni a duratei mandatului membrilor provizorii din cadrul Consiliului de Administratie in forma propusa de Ministerul Energiei si stabilirea indemnizatiei in cuantumul stabilit in conformitate cu Hotararea Adunarii Generale Ordinare a Actionarilor nr 06\/10.08.2022 ANEXA 2.<\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-ANEXA-2-ACT-ADITIONAL-LA-CONTRACT-DE-MANDAT.pdf\">ANEXA 2 Forma actului additional la contractile de mandate propusa de Ministerul Energiei<\/a><\/p><p><strong>Punctul 10 &#8211; Mandatarea<\/strong> reprezentantului Ministerul Energiei in A.G.O.A. pentru a semna, in numele si pe seama Societatii, actele aditionale la contractele de mandat incheiate cu membri provizorii din cadrul Consiliului de Administratie in forma propusa de Ministerul Energiei.<\/p><p><strong>Punctul 11- Aprobarea<\/strong> indicatorilor \u2013 cheie de performanta financiari si nefinanciari rezultati din Planul de Administrare al S.N. Nuclearelectrica S.A care vor constitui anexa la contractele de mandat ale membrilor Consiliului de Administratie selectati in conformitate cu OUG 109\/2011 si Directorilor cu contract de mandat.<\/p><p><strong>Punctul 12 &#8211; Aprobarea <\/strong>formei si continutului Actului Aditional la contractul de mandat ce va fi incheiat cu membrii Consiliului de Administratie al societatii selectati in conformitate cu OUG 109\/2011 in forma si continutul propus de Ministerul Energiei. ANEXA 3.<\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-ANEXA-3-FORMA-ACT-ADITIONAL-.pdf\">ANEXA 3 Forma Actului Aditional la contractual de mandate propusa de Ministerul Energiei<\/a><\/p><p><strong>Punctul 13 &#8211; Aprobarea<\/strong> mandatarii reprezentantului actionarului Statul Roman prin Ministerul Energiei in Adunarea Generala Ordinara a Actionarilor sa semneze Actul Aditional la Contractul de mandat cu membrii Consiliului de Administratie selectati in conformitate cu OUG 109\/2011.<\/p><p><strong>Punctul 14 \u2013<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agoa-2-Nota-AGA-Strategiei-de-Investitii-a-Societatii-Nationale-Nuclearelectrica-S.A_RT.pdf\">Aprobarea<\/a><\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agoa-2-Nota-AGA-Strategiei-de-Investitii-a-Societatii-Nationale-Nuclearelectrica-S.A_RT.pdf\"> \u201eStrategiei de Investi\u0163ii a Societatii Nationale Nuclearelectrica S.A. aferent\u0103 perioadei 2025 \u2013 2030, cu perspectiva anului 2035\u201d<\/a><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/Livrabil-2-strategie-actualizata-RO-v2.pdf\">Anexa \u2013 Strategia de Investitii a Societatii Nationale Nuclearelectrica SA<\/a><\/p><p><strong>Punctul 15 &#8211;<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/AGOA-3-Nota-AGA-plafon-credit-SGB-1.pdf\">Informarea <\/a><\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/AGOA-3-Nota-AGA-plafon-credit-SGB-1.pdf\">cu privire la aprobarea contractarii unui plafon de finantare in suma de 200 milioane lei pentru emitere scrisori de garantie bancara.<\/a><\/p><p><strong>Punctul 16 \u2013<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/AGOA-4-.-Nota-AGA-Rasini-uzate-PJ-23-006_CNE-18.06.2025.pdf\">Informarea <\/a><\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/AGOA-4-.-Nota-AGA-Rasini-uzate-PJ-23-006_CNE-18.06.2025.pdf\">cu privire la adoptarea de catre Consiliul de Administratie al S.N. Nuclearelectrica S.A. (SNN) a deciziei de investire in proiectul \u201cModificarea sistemelor 79140, 38110, 38410 si reabilitarea 1-7914-TK1, conform rezultatelor \u201ccondition assessment\u201d.<\/a><\/p><p><strong>Punctul 17 \u2013<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agoa-5-Nota-AGA-art-52-alin-3-lit-a-OUG-109-13.06.2025-21.07.2025-.pdf\">Informare<\/a><\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agoa-5-Nota-AGA-art-52-alin-3-lit-a-OUG-109-13.06.2025-21.07.2025-.pdf\"> cu privire la tranzactiile incheiate de administratorii ori directorii, cu angajatii, cu actionarii care detin controlul asupra societatii sau o societate controlata de acestia, conform art. 52 al. (3) litera a) din OUG nr. 109\/2011 cu modificarile si completarile ulterioare, in perioada 13.06.2025- 21.07.2025.<\/a><\/p><p><strong>Punctul 18 \u2013<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agoa-6-Nota-AGA-art-52-alin-3-lit-b-OUG-109-13.06.2025-21.07.2025-.pdf\">Informare<\/a><\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agoa-6-Nota-AGA-art-52-alin-3-lit-b-OUG-109-13.06.2025-21.07.2025-.pdf\"> cu privire la tranzactiile incheiate de administratorii ori directorii, cu angajatii, cu actionarii care detin controlul asupra societatii sau o societate controlata de acestia, conform art. 52 al. (3) litera b) din OUG nr. 109\/2011 cu modificarile si completarile ulterioare, in perioada 13.06.2025- 21.07.2025.<\/a><\/p><h2><strong>Adunarea Generala Extraordinara a Actionarilor<\/strong><\/h2><p><strong>Punctul 2 \u2013<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agea-2-Nota-AGEA-Aprobare-imprumut-punte-540-mil.-EUR-final_01.pdf\">Aprobarea <\/a><\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agea-2-Nota-AGEA-Aprobare-imprumut-punte-540-mil.-EUR-final_01.pdf\">a (i) contractarii, de catre SNN, in calitate de imprumutat, a unei finantari in valoare de 540 mil. EUR de la un sindicat bancar (Sindicatul) condus de catre J.P. Morgan, in calitate de imprumutator, pentru finantarea Proiectului \u201cRetehnologizarea Unitatii 1 CNE Cernavoda\u201d (Proiectul), in conditiile detaliate in prezenta Nota, a (ii) \u00eencheierii\/semnarii, de catre SNN, in calitate de imprumutat, a Contractului de Finantare in valoare de 540 mil. EUR cu Sindicatul bancar anterior mentionat, condus de catre J.P. Morgan, pentru finantarea proiectului \u201cRetehnologizarii Unitatii 1 CNE Cernavoda\u201d, in forma anexata prezentei Note si in conditiile detaliate prin aceasta Nota, precum si a (iii) mandatarii Directorului General si a Directorului Financiar ai SNN sa semneze, in numele si pe seama SNN, Contractul de Finantare cu Sindicatul bancar condus de catre J.P. Morgan, precum si pentru indeplinirea tuturor formalitatilor si semnarea tuturor documentelor necesare intrarii in vigoare a contractului antementionat<\/a><\/p><p><strong>Punctul 3 \u2013<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agea-3-Nota-AGEA-Aprobare-imprumut-punte-80-mil.-EUR-final_01.pdf\">Aprobarea<\/a><\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agea-3-Nota-AGEA-Aprobare-imprumut-punte-80-mil.-EUR-final_01.pdf\"> a (i) acordarii, de catre SNN, in calitate de garantor (garant), in favoarea Energonuclear S.A., in calitate de garantat, a unei garantii pentru finantarea, in valoare de 80 mil. EUR, contractata de catre Energonuclear S.A. (in calitate de imprumutat) de la un Sindicat bancar (Sindicatul) condus de catre J.P. Morgan, pentru finantarea proiectului \u201cUnitatile 3 si 4 CNE Cernavoda\u201d, a (ii) Contractului de imprumut in valoare de 80 mil. EUR, dintre Energonuclear S.A., in calitate de imprumutat, SNN, in calitate de garant (garantor) si Sindicatul bancar (Sindicatul) anterior mentionat, condus de catre J.P. Morgan, in calitate de imprumutator, pentru finantarea proiectului \u201cUnitatile 3 si 4 CNE Cernavoda\u201d, a (iii) Conventiei (Acordului) de Garantare a Imprumutului anterior mentionat, ce va fi incheiata (incheiat) de SNN cu societatea Energonuclear S.A., a (iv) mandatarii Directorului General si a Directorului Financiar ai SNN sa semneze, in numele si pe seama SNN, Contractul de imprumut in valoare de 80 mil. EUR, Conventia (Acordul) de Garantare si pentru indeplinirea tuturor formalitatilor si semnarea tuturor documentelor necesare intrarii in vigoare a finantarii antementionate, precum si a (v) mandatarii reprezentantului\/reprezentantilor SNN in Adunarea Generala a Actionarilor Energonuclear S.A. sa voteze cu &#8220;pentru&#8221;\/&#8221;in favoarea&#8221; contractarea\/contractarii, de catre Energonuclear S.A., a imprumutului in valoare de 80 mil. EUR, precum si pentru\/in favoarea contractarea\/contractarii, de catre Energonuclear S.A., in calitate de garantat, de la SNN, in calitate de garant (garantor), a garantiei pentru imprumutul de 80 de milioane de EUR anterior mentionat si pentru mandatarea Directorului General si a Directorului Financiar ai Energonuclear S.A. sa semneze, in numele si pe seama Energonuclear S.A., cele doua contracte anterior mentionate.<\/a><\/p><p>La\u00a0punctele 2 si 3\u00a0de pe ordinea de zi a\u00a0Adunarii Generale Extraordinare a Actionarilor Societatii Nationale Nuclearelectrica S.A. care va avea loc 03.09.2025, ora 11:00 pentru (ora Romaniei), prima convocare, respectiv pentru data de 04.09.2025, ora 11:00 a doua convocare, SNN a publicat urmatoarele:<\/p><ul><li><strong>La punctul 2, nota privind Aprobarea a<\/strong> (i) contractarii, de catre SNN, in calitate de imprumutat, a unei finantari in valoare de 540 mil. EUR de la un sindicat bancar (Sindicatul) condus de catre J.P. Morgan, in calitate de imprumutator, pentru finantarea Proiectului \u201cRetehnologizarea Unitatii 1 CNE Cernavoda\u201d (Proiectul), in conditiile detaliate in prezenta Nota, a (ii) \u00eencheierii\/semnarii, de catre SNN, in calitate de imprumutat, a Contractului de Finantare in valoare de 540 mil. EUR cu Sindicatul bancar anterior mentionat, condus de catre J.P. Morgan, pentru finantarea proiectului \u201cRetehnologizarii Unitatii 1 CNE Cernavoda\u201d, in forma anexata prezentei Note si in conditiile detaliate prin aceasta Nota, precum si a (iii) mandatarii Directorului General si a Directorului Financiar ai SNN sa semneze, in numele si pe seama SNN, Contractul de Finantare cu Sindicatul bancar condus de catre J.P. Morgan, precum si pentru indeplinirea tuturor formalitatilor si semnarea tuturor documentelor necesare intrarii in vigoare a contractului antementionat<\/li><li><strong>La punctul 3, nota privind Aprobarea <\/strong>a (i) acordarii, de catre SNN, in calitate de garantor (garant), in favoarea Energonuclear S.A., in calitate de garantat, a unei garantii pentru finantarea, in valoare de 80 mil. EUR, contractata de catre Energonuclear S.A. (in calitate de imprumutat) de la un Sindicat bancar (Sindicatul) condus de catre J.P. Morgan, pentru finantarea proiectului \u201cUnitatile 3 si 4 CNE Cernavoda\u201d, a (ii) Contractului de imprumut in valoare de 80 mil. EUR, dintre Energonuclear S.A., in calitate de imprumutat, SNN, in calitate de garant (garantor) si Sindicatul bancar (Sindicatul) anterior mentionat, condus de catre J.P. Morgan, in calitate de imprumutator, pentru finantarea proiectului \u201cUnitatile 3 si 4 CNE Cernavoda\u201d, a (iii) Conventiei (Acordului) de Garantare a Imprumutului anterior mentionat, ce va fi incheiata (incheiat) de SNN cu societatea Energonuclear S.A., a (iv) mandatarii Directorului General si a Directorului Financiar ai SNN sa semneze, in numele si pe seama SNN, Contractul de imprumut in valoare de 80 mil. EUR, Conventia (Acordul) de Garantare si pentru indeplinirea tuturor formalitatilor si semnarea tuturor documentelor necesare intrarii in vigoare a finantarii antementionate, precum si a (v) mandatarii reprezentantului\/reprezentantilor SNN in Adunarea Generala a Actionarilor Energonuclear S.A. sa voteze cu &#8220;pentru&#8221;\/&#8221;in favoarea&#8221; contractarea\/contractarii, de catre Energonuclear S.A., a imprumutului in valoare de 80 mil. EUR, precum si pentru\/in favoarea contractarea\/contractarii, de catre Energonuclear S.A., in calitate de garantat, de la SNN, in calitate de garant (garantor), a garantiei pentru imprumutul de 80 de milioane de EUR anterior mentionat si pentru mandatarea Directorului General si a Directorului Financiar ai Energonuclear S.A. sa semneze, in numele si pe seama Energonuclear S.A., cele doua contracte anterior mentionate.<\/li><\/ul><p>Pentru protejarea intereselor sale comerciale legitime, precum si cele ale Asocierii, avand in vedere informatiile de natura comerciala din:<\/p><p>-Anexa 1 la NOTA AGEA <strong>\u00a0Nr. E-DCF-NOTA AGA-APROB-03481-21-07-25 <\/strong>privind <strong>aprobarea,<\/strong> de catre Adunare Generala Extraordinada a Actionarilor SNN, a (i) contractarii, de catre SNN, in calitate de imprumutat, a unei finantari in valoare de 540 mil. EUR de la un sindicat bancar (Sindicatul) condus de catre J.P. Morgan, in calitate de imprumutator, pentru finantarea Proiectului \u201cRetehnologizarea Unitatii 1 CNE Cernavoda\u201d (Proiectul), in conditiile detaliate in prezenta Nota, a (ii) \u00eencheierii\/semnarii, de catre SNN, in calitate de imprumutat, a Contractului de Finantare in valoare de 540 mil. EUR cu Sindicatul bancar anterior mentionat, condus de catre J.P. Morgan, pentru finantarea proiectului \u201cRetehnologizarii Unitatii 1 CNE Cernavoda\u201d, in forma anexata prezentei Note si in conditiile detaliate prin aceasta Nota, precum si a (iii) mandatarii Directorului General si a Directorului Financiar ai SNN sa semneze, in numele si pe seama SNN, Contractul de Finantare cu Sindicatul bancar condus de catre J.P. Morgan, precum si pentru indeplinirea tuturor formalitatilor si semnarea tuturor documentelor necesare intrarii in vigoare a contractului antementionat<\/p><p>-Contractul avand ca obiect \u201c Forma negociata a Contractului de finantare in valoare de 540 mil. EUR cu sindicatul bancar condus si aranjat de catre J.P. Morgan pentru finantarea proiectului \u201cRetehnologizarea Unitatii 1 CNE Cernavoda\u201d<\/p><p>\u2013 Anexa 1 si Anexa 2 la NOTA AGEA <strong>Nr. E-DCF-NOTA AGA-APROB-03480-21-07-25 <\/strong>privind <strong>aprobarea<\/strong> de catre Adunarea Generala Extraordinara a Actionarilor SNN, a (i) acordarii, de catre SNN, in calitate de garantor (garant), in favoarea Energonuclear S.A., in calitate de garantat, a unei garantii pentru finantarea, in valoare de 80 mil. EUR, contractata de catre Energonuclear S.A. (in calitate de imprumutat) de la un Sindicat bancar (Sindicatul) condus de catre J.P. Morgan, pentru finantarea proiectului \u201cUnitatile 3 si 4 CNE Cernavoda\u201d, a (ii) Contractului de imprumut in valoare de 80 mil. EUR, dintre Energonuclear S.A., in calitate de imprumutat, SNN, in calitate de garant (garantor) si Sindicatul bancar (Sindicatul) anterior mentionat, condus de catre J.P. Morgan, in calitate de imprumutator, pentru finantarea proiectului \u201cUnitatile 3 si 4 CNE Cernavoda\u201d, a (iii) Conventiei (Acordului) de Garantare a Imprumutului anterior mentionat, ce va fi incheiata (incheiat) de SNN cu societatea Energonuclear S.A., a (iv) mandatarii Directorului General si a Directorului Financiar ai SNN sa semneze, in numele si pe seama SNN, Contractul de imprumut in valoare de 80 mil. EUR, Conventia (Acordul) de Garantare si pentru indeplinirea tuturor formalitatilor si semnarea tuturor documentelor necesare intrarii in vigoare a finantarii antementionate, precum si a (v) mandatarii reprezentantului\/reprezentantilor SNN in Adunarea Generala a Actionarilor Energonuclear S.A. sa voteze cu &#8220;pentru&#8221;\/&#8221;in favoarea&#8221; contractarea\/contractarii, de catre Energonuclear S.A., a imprumutului in valoare de 80 mil. EUR, precum si pentru\/in favoarea contractarea\/contractarii, de catre Energonuclear S.A., in calitate de garantat, de la SNN, in calitate de garant (garantor), a garantiei pentru imprumutul de 80 de milioane de EUR anterior mentionat si pentru mandatarea Directorului General si a Directorului Financiar ai Energonuclear S.A. sa semneze, in numele si pe seama Energonuclear S.A., cele doua contracte anterior mentionate<\/p><p>Anexa 1- Forma negociata a Contractului de finantare in valoare de 80 mil. EUR cu sindicatul bancar condus si aranjat de catre J.P. Morgan pentru finantarea proiectului \u201cUnitatilor 3 si 4 CNE Cernavoda\u201d<\/p><p>Anexa 2- Contractul (Acordul) de Garantare intre SNN si EN<\/p><p>SNN a decis, in conditiile legislatiei aplicable dreptului actionarilor de a avea acces la informa\u0163ii suficiente despre problemele supuse aprobarii AGA, in spiritul transparentei, bunei credinte si bunelor practici, sa le ofere posibilitatea actionarilor, cu \u00eendeplinirea cerin\u0163elor de identificare prev\u0103zute in Convocatorul AGA, respectiv cerinta de a detine calitatea de actionar la data de referinta 20.08.2025, sa emita o cerere in acest sens insotita de Acordul de confidentialitate<strong>\u00a0<\/strong><strong>(<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/NDA-AGEA-finantari-MLA_-sm.docx\">link<\/a>)<\/strong>\u00a0completat si o copie CI pentru a primi acces la urmatoarele:<\/p><p>-Anexa 1 la NOTA AGEA <strong>\u00a0Nr. E-DCF-NOTA AGA-APROB-03481-21-07-25\u00a0 <\/strong>privind <strong>aprobarea,<\/strong> de catre Adunare Generala Extraordinada a Actionarilor SNN, a (i) contractarii, de catre SNN, in calitate de imprumutat, a unei finantari in valoare de 540 mil. EUR de la un sindicat bancar (Sindicatul) condus de catre J.P. Morgan, in calitate de imprumutator, pentru finantarea Proiectului \u201cRetehnologizarea Unitatii 1 CNE Cernavoda\u201d (Proiectul), in conditiile detaliate in prezenta Nota, a (ii) \u00eencheierii\/semnarii, de catre SNN, in calitate de imprumutat, a Contractului de Finantare in valoare de 540 mil. EUR cu Sindicatul bancar anterior mentionat, condus de catre J.P. Morgan, pentru finantarea proiectului \u201cRetehnologizarii Unitatii 1 CNE Cernavoda\u201d, in forma anexata prezentei Note si in conditiile detaliate prin aceasta Nota, precum si a (iii) mandatarii Directorului General si a Directorului Financiar ai SNN sa semneze, in numele si pe seama SNN, Contractul de Finantare cu Sindicatul bancar condus de catre J.P. Morgan, precum si pentru indeplinirea tuturor formalitatilor si semnarea tuturor documentelor necesare intrarii in vigoare a contractului antementionat<\/p><p>-Contractul avand ca obiect \u201c Forma negociata a Contractului de finantare in valoare de 540 mil. EUR cu sindicatul bancar condus si aranjat de catre J.P. Morgan pentru finantarea proiectului \u201cRetehnologizarea Unitatii 1 CNE Cernavoda\u201d<\/p><p>\u2013 Anexa 1 si Anexa 2 la NOTA AGEA <strong>Nr. E-DCF-NOTA AGA-APROB-03480-21-07-25 <\/strong>privind <strong>aprobarea<\/strong> de catre Adunarea Generala Extraordinara a Actionarilor SNN, a (i) acordarii, de catre SNN, in calitate de garantor (garant), in favoarea Energonuclear S.A., in calitate de garantat, a unei garantii pentru finantarea, in valoare de 80 mil. EUR, contractata de catre Energonuclear S.A. (in calitate de imprumutat) de la un Sindicat bancar (Sindicatul) condus de catre J.P. Morgan, pentru finantarea proiectului \u201cUnitatile 3 si 4 CNE Cernavoda\u201d, a (ii) Contractului de imprumut in valoare de 80 mil. EUR, dintre Energonuclear S.A., in calitate de imprumutat, SNN, in calitate de garant (garantor) si Sindicatul bancar (Sindicatul) anterior mentionat, condus de catre J.P. Morgan, in calitate de imprumutator, pentru finantarea proiectului \u201cUnitatile 3 si 4 CNE Cernavoda\u201d, a (iii) Conventiei (Acordului) de Garantare a Imprumutului anterior mentionat, ce va fi incheiata (incheiat) de SNN cu societatea Energonuclear S.A., a (iv) mandatarii Directorului General si a Directorului Financiar ai SNN sa semneze, in numele si pe seama SNN, Contractul de imprumut in valoare de 80 mil. EUR, Conventia (Acordul) de Garantare si pentru indeplinirea tuturor formalitatilor si semnarea tuturor documentelor necesare intrarii in vigoare a finantarii antementionate, precum si a (v) mandatarii reprezentantului\/reprezentantilor SNN in Adunarea Generala a Actionarilor Energonuclear S.A. sa voteze cu &#8220;pentru&#8221;\/&#8221;in favoarea&#8221; contractarea\/contractarii, de catre Energonuclear S.A., a imprumutului in valoare de 80 mil. EUR, precum si pentru\/in favoarea contractarea\/contractarii, de catre Energonuclear S.A., in calitate de garantat, de la SNN, in calitate de garant (garantor), a garantiei pentru imprumutul de 80 de milioane de EUR anterior mentionat si pentru mandatarea Directorului General si a Directorului Financiar ai Energonuclear S.A. sa semneze, in numele si pe seama Energonuclear S.A., cele doua contracte anterior mentionate<\/p><p>Anexa 1- Forma negociata a Contractului de finantare in valoare de 80 mil. EUR cu sindicatul bancar condus si aranjat de catre J.P. Morgan pentru finantarea proiectului \u201cUnitatilor 3 si 4 CNE Cernavoda\u201d<\/p><p>Anexa 2- Contractul (Acordul) de Garantare intre SNN si EN<\/p><p>SNN va efectua verificarea detinerii calitatii de membru la data de 20.08.2025 in registrul actionarilor transmis de Depozitarul Central si va pune la dispozitie documentele.<\/p><p>Cererile, insotite de angajamentul de confidentialitate semnat si copia CI vor fi transmise in atentia Consiliului de Administratie al SNN, fie in format fizic prin depunerea la Registratura SNN, din Bulevardul Iancu de Hunedoara, nr. 48, sector 1, Bucuresti, in intervalul orar 08:00 \u2013 16:00, fie prin trimiterea online, cu semnatura electronica extinsa incorporata conform Legii nr. 455\/2001 la adresa de email\u00a0<a href=\"https:\/\/mail.nuclearelectrica.ro\/owa\/redir.aspx?C=9euT_PqWkO49upnCvBdPMT-inkve_6FA_S2UYTT4z957OEusqOzVCA..&amp;URL=mailto%3aaga%40nuclearelectrica.ro\">aga@nuclearelectrica.ro<\/a>\u00a0cu tiltul \u201cSolicitare de furnizare documente AGEA 03.09.2025\u201d.<\/p><p>Copia\u00a0documentatiei de mai sus\u00a0va fi pusa la dispozitie spre ridicare de la Registratura SNN din Bulevardul Iancu de Hunedoara nr. 48, sector 1, Bucuresti, in intervalul orar 08:00 \u2013 16:00 pentru solicitarile primite in format fizic si electronic, prin trimitere pe email, cu semnatura electronica SNN incorporata, pentru solicitarile primite pe email.<\/p><p><strong>Punctul 4 \u2013<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agea-4-20250721_Nota-AGEA_ISA_final_vc_clean.pdf\">Aprobarea <\/a><\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agea-4-20250721_Nota-AGEA_ISA_final_vc_clean.pdf\">incheierii Contractului de servicii de iradiere \u201eIsotope Irradiation Service Agreement\u201d dintre S.N. Nuclearelectrica S.A. si Framatome GmbH, aferent dezvoltarii proiectului IRIS (Innovative Romanian Isotope System) privind producerea de radioizotopi medicali la CNE Cernavoda si mandatarii conducerii executive a SNN sa semneze contractul, in numele si pe seama SNN.<\/a><\/p><p><strong>Punctul 5 \u2013<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agea-5-20250721_Nota-AGA_aprobare-Acord-tripartit-SHA-SNN_NPG_DSPE_FG_AR2.pdf\">Aprobarea <\/a><\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agea-5-20250721_Nota-AGA_aprobare-Acord-tripartit-SHA-SNN_NPG_DSPE_FG_AR2.pdf\">(i) propunerii de incheiere a Acordului Actionarilor (\u201eSHA\u201d), avand ca parti SNN, NOVA POWER &amp; GAS S.R.L. (NPG) si DSPE BETA PRIVATE EQUITY FUND (DSPE\/PEF) si ca obiect dezvoltarea Proiectului Reactoarelor Modulare Mici (\u201eSMR\u201d)\u00a0 in Doicesti, Romania, in forma negociata intre parti, (ii) mandatarii conducerii executive a SNN sa semneze,\u00a0 in numele si pe seama actionarului SNN, Acordul Actionarilor anterior mentionat, (iii) mandatarii reprezentantului SNN in AGEA Ropower Nuclear S.A. (\u201eRPN\u201d) sa voteze cu privire la formalitatile ce se impun cu privire la perfectarea tranzactiei de modificare a structurii actionariatului companiei.<\/a><\/p><p>La \u00a0<strong>pct. 4 \u2013 5<\/strong> de pe Ordinea de zi a <strong>Adunarii Generale Extraordinare a Actionarilor Societatii Nationale Nuclearelectrica S.A.<\/strong>, convocata pentru data de <strong>03.09.2025<\/strong>, ora 11:00 (ora Romaniei) prima convocare, respectiv pentru data de 04.09.2025, ora 11:00 a doua convocare, SNN a publicat urmatoarele:<\/p><ul><li>La punctul <strong>4<\/strong>, nota privind aprobarea propunerii de incheiere a Contractului de servicii de iradiere \u201cIsotope Irradiation Service Agreement\u201d dintre S.N. Nuclearelectrica S.A. si Framatome GmbH, aferent dezvoltarii proiectului IRIS (Innovative Romanian Isotope System) privind producerea de radioizotopi medicali la CNE Cernavoda si mandatarii conducerii executive a SNN sa semneze contractul, in numele si pe seama SNN;<\/li><li>La punctul <strong>5<\/strong>, nota privind aprobarea (i) propunerii de incheiere a Acordului Actionarilor (\u201eSHA\u201d), avand ca parti SNN, NOVA POWER &amp; GAS S.R.L. (NPG) si DSPE BETA PRIVATE EQUITY FUND (DSPE\/PEF) si ca obiect dezvoltarea Proiectului Reactoarelor Modulare Mici (\u201eSMR\u201d) in Doicesti, Romania, in forma negociata intre parti, (ii) mandatarii conducerii executive a SNN sa semneze,\u00a0 in numele si pe seama actionarului SNN, Acordul Actionarilor anterior mentionat, (iii) mandatarii reprezentantului SNN in AGEA RoPower Nuclear S.A. (\u201eRPN\u201d) sa voteze cu privire la formalitatile ce se impun cu privire la perfectarea tranzactiei de modificare a structurii actionariatului companiei\u201d.<\/li><\/ul><p>Avand in vedere caracterul confidential al anumitor informatii comerciale, detaliat prezentate:<\/p><ul><li>La punctul<strong> 4, <\/strong>in<strong> Contractul de servicii de iradiere (\u201cIsotope Irradiation Service Agreement\u201d);<\/strong><\/li><li>La punctul<strong> 5, <\/strong>in<strong> Acordul Actionarilor (\u201cSHA\u201d),<\/strong><\/li><\/ul><p>in scopul protejarii intereselor legitime atat ale SNN cat si pe cele apartinand Asocierii:<\/p><p>SNN a decis, in conditiile legislatiei aplicable dreptului actionarilor de a avea acces la informa\u0163ii suficiente despre problemele supuse aprobarii AGA, in spiritul transparentei, bunei credinte si bunelor practici, sa le ofere posibilitatea actionarilor, cu \u00eendeplinirea cerin\u0163elor de identificare prev\u0103zute in Convocatorul AGA, respectiv cerinta de a detine calitatea de actionar la data de referinta 20.08.2025, sa emita o cerere in acest sens insotita de Acordul de confidentialitate<strong> <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/RO-NDA-STUDIU-AGEA-pct.-4-5.docx\">(link)<\/a><\/strong>\u00a0completat si o copie CI pentru a primi acces la urmatoarele:<\/p><ul><li>pentru punctul\u00a0<strong> 4, <\/strong>la <strong>\u00a0Contractul de servicii de iradiere (\u201cIsotope Irradiation Service Agreement\u201d);<\/strong><\/li><li>pentru punctul <strong>\u00a05, <\/strong>la<strong>\u00a0Acordul Actionarilor (\u201cSHA\u201d),<\/strong><\/li><\/ul><p>SNN va efectua verificarea detinerii calitatii de membru la data de 20.08.2025 in registrul actionarilor transmis de Depozitarul Central si va pune la dispozitie documentele.<\/p><p>Cererile, insotite de angajamentul de confidentialitate semnat si de documentele precizate anterior, vor fi transmise in atentia Consiliului de Administratie al SNN, fie in format fizic prin depunerea la Registratura SNN, din Bulevardul Iancu de Hunedoara, nr. 48, sector 1, Bucuresti, in intervalul orar 08:00 \u2013 16:00, fie prin trimiterea online, cu semnatura electronica extinsa incorporata conform Legii nr. 455\/2001 la adresa de email\u00a0<a href=\"https:\/\/mail.nuclearelectrica.ro\/owa\/redir.aspx?C=9euT_PqWkO49upnCvBdPMT-inkve_6FA_S2UYTT4z957OEusqOzVCA..&amp;URL=mailto%3aaga%40nuclearelectrica.ro\">aga@nuclearelectrica.ro<\/a>\u00a0cu tiltul \u201cSolicitare de furnizare documente AGEA 03.09.2025\u201d.<\/p><p>Copia\u00a0documentatiei de mai sus\u00a0va fi pusa la dispozitie spre ridicare de la Registratura SNN din Bulevardul Iancu de Hunedoara nr. 48, sector 1, Bucuresti, in intervalul orar 08:00 \u2013 16:00 pentru solicitarile primite in format fizic si electronic, prin trimitere pe email, cu semnatura electronica SNN incorporata, pentru solicitarile primite pe email.<\/p><p><strong>Punctul 6 \u2013<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agea-6-7-Nota-AGA-aprobare-actualizare-Act-Constitutiv-SNN-urmare-a-recodificarii-obiectului-de-activitate.pdf\">Aprobarea<\/a><\/strong><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/agea-6-7-Nota-AGA-aprobare-actualizare-Act-Constitutiv-SNN-urmare-a-recodificarii-obiectului-de-activitate.pdf\"> actualizarii actului constitutiv al SNN ca urmare a recodificarii obiectului de activitate realizat de catre Oficiul Registrului Comertului de pe langa Tribunalul Bucuresti, prezentate in Anexa la convocator.<\/a><\/p><p><strong>Punctul 7 &#8211; Imputernicirea<\/strong> Presedintelui Consiliului de Administratie pentru a semna actul constitutiv actualizat, declaratia pe propria raspundere cu privire la indeplinirea conditiilor de functionare\/desfasurare a activitatii la ORC, precum si pentru indeplinirea oricaror alte formalitati necesare pentru inregistrarea actualizarii Actului Constitutiv.<\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/Act-constitutiv-SNN-consolidat-iulie-2025_dupa-recodificare.pdf\">Anexa \u2013 Act Constitutiv al Societatii Nationale Nuclearelectrica SA<\/a><\/p><h2>\u00a0<\/h2><h3 style=\"background: white;margin: 11.25pt 0in 15.0pt 0in\"><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-ADRESA-ME-SOLICITARE-COMPLETARE-AGA-03.09.2025.pdf\">Solicitare de completare a ordinii de zi din partea actionarului majoritar, Ministerul Energiei<\/a><\/h3><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-ANEXA-1-CONTRACT-DE-MANDAT-1.pdf\">ANEXA 1 &#8211; CONTRACT DE MANDAT<\/a><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-ANEXA-2-ACT-ADITIONAL-LA-CONTRACT-DE-MANDAT-1.pdf\">ANEXA 2 &#8211; ACT ADITIONAL LA CONTRACT DE MANDAT<\/a><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-ANEXA-3-FORMA-ACT-ADITIONAL-1-1.pdf\">ANEXA 3 &#8211; FORMA ACT ADITIONAL<\/a><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-ANEXA-4-1-1.pdf\">ANEXA 4 &#8211; LISTA PROPUNERI MINISTERUL ENERGIEI<\/a><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-CV-ARTUR-STRATAN-1.pdf\">CV ARTUR STRATAN<\/a><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/ro-CV-MIHAI-DORIN-PENA-1-1.pdf\">CV MIHAI DORIN PENA<\/a><\/p><p><strong>Imputerniciri generale<\/strong><\/p><p>Imputernicire generala persoane fizice AGOA \u00a0\u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/SNN_imputernicire_generala_AGOA_persoane_fizice_RO.doc\">aici<\/a><\/p><p>Imputernicire generala persoane juridice AGOA \u2013 click<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/SNN_imputernicire_generala_AGOA_persoane_juridice_RO.doc\">\u00a0aici<\/a><\/p><p>Imputernicire generala persoane fizice AGEA \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/SNN_imputernicire_generala_AGEA_persoane_fizice_RO.doc\">aici<\/a><\/p><p>Imputernicire generala persoane juridice AGEA \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/SNN_imputernicire_generala_AGEA_persoane_juridice_RO.doc\">aici<\/a><\/p><p><strong>Imputerniciri speciale<\/strong><\/p><p>Imputernicire speciala persoane fizice AGOA\u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/Imputernicire-speciala-pentru-actionari-persoane-fizice-AGOA-03.09.2025.docx\">aici<\/a><\/p><p><strong>ORDINE DE ZI COMPLETATA \u2013<\/strong> Imputernicire speciala persoane fizice AGOA\u00a0\u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/Imputernicire-speciala-pentru-actionari-persoane-fizice-AGOA-03.09.2025-actualizata.docx\">aici<\/a><\/p><p><strong>VOT SECRET<\/strong> \u2013 Imputernicire speciala persoane fizice AGOA\u00a0\u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/Imputernicire-speciala-pentru-actionari-persoane-fizice-AGOA-03.09.2025-actualizata-vot-secret.docx\">aici<\/a><\/p><p>Imputernicire speciala persoane juridice AGOA\u00a0 \u00a0\u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/Imputernicire-speciala-pentru-actionari-persoane-juridice-AGOA-03.09.2025.docx\">aici<\/a><\/p><p><strong>ORDINE DE ZI COMPLETATA<\/strong> \u2013 Imputernicire speciala persoane juridice AGOA \u2013 click<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/Imputernicire-speciala-pentru-actionari-persoane-juridice-AGOA-03.09.2025-actualizata.docx\">\u00a0aici<\/a><\/p><p><strong>VOT SECRET<\/strong> \u2013 Imputernicire speciala persoane juridice AGOA \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/Imputernicire-speciala-pentru-actionari-persoane-juridice-AGOA-03.09.2025-actualizata-vot-secret.docx\">aici<\/a><\/p><p>Imputernicire speciala persoane fizice AGEA\u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/Imputernicire-speciala-pentru-actionari-persoane-fizice-AGEA-03.09.2025.docx\">aici<\/a><\/p><p>Imputernicire speciala persoane juridice AGEA\u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/Imputernicire-speciala-pentru-actionari-persoane-juridice-AGEA-03.09.2025.docx\">aici<\/a><\/p><p><strong>Buletine de vot prin corespondenta<\/strong><\/p><p>Buletin de vot prin corespondenta actionari persoane fizice AGOA\u00a0 \u2013 click<u> <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/BVC-persoane-fizice-AGOA-03.09.2025.docx\">aici<\/a><\/u><\/p><p><strong>ORDINE DE ZI COMPLETATA<\/strong> \u2013 Buletin de vot prin corespondenta actionari persoane fizice AGOA\u00a0 \u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/BVC-persoane-fizice-AGOA-03.09.2025.docx\">aici<\/a><\/p><p><strong>VOT SECRET<\/strong> \u2013\u00a0Buletin de vot prin corespondenta actionari persoane fizice AGOA \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/BVC-persoane-fizice-AGOA-03.09.2025-vot-secret.docx\">aici<\/a><\/p><p>Buletin de vot prin corespondenta actionari persoane juridice AGOA\u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/BVC-persoane-juridice-AGOA-03.09.2025.docx\">aici<\/a><\/p><p><strong>ORDINE DE ZI COMPLETATA<\/strong> \u2013 Buletin de vot prin corespondenta actionari persoane juridice AGOA\u00a0\u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/BVC-persoane-juridice-AGOA-03.09.2025-actualizat.docx\">aici<\/a><\/p><p><strong>VOT SECRET<\/strong> \u2013\u00a0Buletin de vot prin corespondenta actionari persoane juridice AGOA\u00a0\u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/BVC-persoane-juridice-AGOA-03.09.2025-actualizat-vot-secret.docx\">aici<\/a><\/p><p>Buletin de vot prin corespondenta actionari persoane fizice AGEA\u00a0 \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/BVC-persoane-fizice-AGEA-03.09.2025.docx\">aici<\/a><\/p><p>Buletin de vot prin corespondenta actionari persoane juridice AGEA \u2013 click <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/07\/BVC-persoane-juridice-AGEA-03.09.2025.docx\">aici<\/a><\/p><p><strong>Proiecte de hotarari<\/strong><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/Proiect-HAGOA-SNN-03.09.2025-RO-1.doc\">Proiect hotarare AGOA<\/a><\/p><p><strong>ORDINE DE ZI COMPLETATA \u2013<\/strong> <a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/Proiect-HAGOA-SNN-03.09.2025-RO-actualizat.doc\">Proiect de hotarare\u00a0AGOA<\/a><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/Proiect-HAGEA-SNN-03.09.2025-RO-1.docx\">Proiect hotarare AGEA<\/a><\/p><p><strong>ORDINE DE ZI COMPLETATA <\/strong>\u2013<a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/08\/Proiect-HAGEA-SNN-03.09.2025-RO-actualizat.docx\">Proiect de hotarare AGEA<\/a><\/p><p>\u00a0<\/p><h2>Hotarari\u00a0<\/h2><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/09\/HAGOA-SNN-03.09.2025-RO-actualizat.pdf\">Hotarare AGOA\u00a0<\/a><\/p><p><a href=\"https:\/\/nuclearelectrica.ro\/ir\/wp-content\/uploads\/sites\/3\/2025\/09\/HAGEA-SNN-03.09.2025-RO-actualizat.pdf\">Hotarare AGEA\u00a0<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-34c657a elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"34c657a\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-c98f972 top column-style-top\" data-id=\"c98f972\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-0ffbf40 elementor-widget elementor-widget-text-editor\" data-id=\"0ffbf40\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-c5eeb5d elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"c5eeb5d\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-a647e88 top column-style-top\" data-id=\"a647e88\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-65160ba elementor-widget elementor-widget-text-editor\" data-id=\"65160ba\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Regulamentul privind organizarea si desfasurarea Adunarilor Generale ale Actionarilor SNN actualizat la nivelul lunii octombrie 2020 prin Decizia Consiliului de Administratie nr. 205\/15.10.2020 Convocatorul Adunarii Generale Ordinare\u00a0 si Extraordinare a Actionarilor pentru data de 03.09.2025 Convocatorul completat al Adunarii Generale Ordinare si Extraordinare pentru data de 03.09.2025 \u00a0 Adunarea Generala Ordinara a Actionarilor Punctul 2 [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1270,364],"tags":[],"class_list":["post-47065","post","type-post","status-publish","format-standard","hentry","category-2025-ro","category-informatii-referitoare-la-aga"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/posts\/47065","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/comments?post=47065"}],"version-history":[{"count":31,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/posts\/47065\/revisions"}],"predecessor-version":[{"id":47538,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/posts\/47065\/revisions\/47538"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/media?parent=47065"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/categories?post=47065"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/ir\/wp-json\/wp\/v2\/tags?post=47065"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}