{"id":11417,"date":"2017-01-06T09:05:24","date_gmt":"2017-01-06T09:05:24","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=11417"},"modified":"2025-02-24T13:47:56","modified_gmt":"2025-02-24T13:47:56","slug":"press-release-the-disconnection-of-cernavoda-npp-unit-1-from-the-national-power-grid","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2017\/01\/06\/press-release-the-disconnection-of-cernavoda-npp-unit-1-from-the-national-power-grid\/","title":{"rendered":"Press release &#8211; the disconnection of Cernavoda NPP Unit 1 from the national power grid"},"content":{"rendered":"<p style=\"text-align: center\"><strong>Press release<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>SN Nuclearelectrica SA announces that Cernavpda NPP Unit 1 was disconnected from the National Power Grid, due to external causes, during the morning of January 6<sup>th<\/sup> 2017, 08:25 hours, due to disturbances in the power evacuation line of 400 Kv, belonging to the grip operator.<\/p>\n<p>&nbsp;<\/p>\n<p>This disturbance, caused by the unfavorable weather conditions in the area, lead to the automated disconnection of Unit\u2019s 1 turbogenerator from the National Power Grid, the reactor remaining at a low operating power.<\/p>\n<p>&nbsp;<\/p>\n<p>The systems of the power plant are functioning in compliance with the project and there is no impact on the nuclear safety of the reactor, operational personnel, population and environment.<\/p>\n<p>SN Nuclearelectrica SA will issue a press release once Unit 1 is reconnected to the National Power Grid.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>CEO<\/p>\n<p>Daniela Lulache<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Press release &nbsp; &nbsp; SN Nuclearelectrica SA announces that Cernavpda NPP Unit 1 was disconnected from the National Power Grid, due to external causes, during the morning of January 6th 2017, 08:25 hours, due to disturbances in the power evacuation line of 400 Kv, belonging to the grip operator. &nbsp; This disturbance, caused by the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":985,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-11417","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/11417","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=11417"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/11417\/revisions"}],"predecessor-version":[{"id":43887,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/11417\/revisions\/43887"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=11417"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=11417"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=11417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}