{"id":1247,"date":"2013-03-11T08:34:31","date_gmt":"2013-03-11T08:34:31","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=1247"},"modified":"2025-02-24T13:47:57","modified_gmt":"2025-02-24T13:47:57","slug":"re-connection-of-cernavoda-npp-unit-2-to-the-national-power-grid","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2013\/03\/11\/re-connection-of-cernavoda-npp-unit-2-to-the-national-power-grid\/","title":{"rendered":"Re-connection of Cernavoda NPP Unit 2 to the National Power Grid"},"content":{"rendered":"<p style=\"color: #595959;text-align: justify\">SN Nuclearelectrica SA announces the re-connection to the National Power Grid of the Cernavoda NPP\u2019s Unit 2, on March 10, 2013, hours 07:25 pm, after having retrieved the deficiency found as a result of the investigations carried out by the specialists of the nuclear power plant and of the manufacturer, General Electric.<\/p>\n<p style=\"color: #595959;text-align: justify\">The disconnection occurred because of the activation of a protection of the electric generator control system as a consequence of certain signals received from its excitation system.<\/p>\n<p style=\"color: #595959;text-align: justify\">The re-connection activities have been performed in compliance with the power plant procedures and the safety and protection requirements, with no adverse impact on population, staff, equipment and environment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SN Nuclearelectrica SA announces the re-connection to the National Power Grid of the Cernavoda NPP\u2019s Unit 2, on March 10, 2013, hours 07:25 pm, after having retrieved the deficiency found as a result of the investigations carried out by the specialists of the nuclear power plant and of the manufacturer, General Electric. The disconnection occurred [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":880,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-1247","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/1247","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=1247"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/1247\/revisions"}],"predecessor-version":[{"id":43962,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/1247\/revisions\/43962"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=1247"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=1247"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=1247"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}