{"id":1265,"date":"2013-01-09T11:29:15","date_gmt":"2013-01-09T11:29:15","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=1265"},"modified":"2025-02-24T13:47:57","modified_gmt":"2025-02-24T13:47:57","slug":"automatic-disconnection-of-unit-2-from-the-national-power-grid-09-01-2013","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2013\/01\/09\/automatic-disconnection-of-unit-2-from-the-national-power-grid-09-01-2013\/","title":{"rendered":"Automatic disconnection of Unit 2 from the National Power Grid, 09.01.2013"},"content":{"rendered":"<p style=\"color: #595959;text-align: justify\">Societatea Naionala Nuclearelectrica announces the automatic disconnection from the National Power Grid of the Cernavoda NPP\u2019s Unit 2, today, 9 January 2013, hours 2:45 pm.<\/p>\n<p style=\"color: #595959;text-align: justify\">The disconnection was the result of some disturbances in the cooling system of the Unit\u2019s electric generator.<\/p>\n<p style=\"color: #595959;text-align: justify\">The reactor is maintained safe, operating at 60% of its power, ready to be connected to the National Power Grid, only after the causes of the disconnection would have been clarified and the remedial measures taken.<\/p>\n<p style=\"color: #595959;text-align: justify\">All the Unit\u2019s systems operated in compliance with the plant design and no adverse impact occurred with respect to nuclear safety, population and environment protection.<\/p>\n<p style=\"color: #595959;text-align: justify\">The re-connection to the National Power Grid will be carried out in mutual agreement with the National Power Dispatcher.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Societatea Naionala Nuclearelectrica announces the automatic disconnection from the National Power Grid of the Cernavoda NPP\u2019s Unit 2, today, 9 January 2013, hours 2:45 pm. The disconnection was the result of some disturbances in the cooling system of the Unit\u2019s electric generator. The reactor is maintained safe, operating at 60% of its power, ready to [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":918,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-1265","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/1265","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=1265"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/1265\/revisions"}],"predecessor-version":[{"id":43968,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/1265\/revisions\/43968"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=1265"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=1265"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=1265"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}