{"id":1381,"date":"2010-04-21T10:54:34","date_gmt":"2010-04-21T10:54:34","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=1381"},"modified":"2025-02-24T13:47:58","modified_gmt":"2025-02-24T13:47:58","slug":"cernavoda-npp-unit-1-unplanned-shutdown","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2010\/04\/21\/cernavoda-npp-unit-1-unplanned-shutdown\/","title":{"rendered":"Cernavoda NPP Unit 1 &#8211; unplanned shutdown"},"content":{"rendered":"<p style=\"color: #595959;text-align: justify\">SN Nuclearectrica SA announces the desynchronization of Cernavoda NPP Unit 1 from the national power grig, on April 19<sup>th<\/sup>\u00a02010, as consequence to an earth flaw of the S phase on a 24 kV bar. The 24 kV bar connects the turbo generator to the power evacuation transformer, being situated outside the turbo generator building.<\/p>\n<p style=\"color: #595959;text-align: justify\">The NPP specialists have determined that the earth flaw was caused by a flashover of the electro insulation rod that activates the 24 kV separator afferent to the power evacuation transformer. The flaw was also influenced by humidity conditions.<\/p>\n<p style=\"color: #595959;text-align: justify\">All security systems have functioned according to the project and the power plant personnel has respected the established procedures.<\/p>\n<p style=\"color: #595959;text-align: justify\">The parallel with the National Power Grid is scheduled for the evening of April 21<sup>st<\/sup>, 2010.<\/p>\n<p style=\"color: #595959;text-align: justify\">We mention the fact that the event did not affect the security of the personnel, of the population or of the environment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SN Nuclearectrica SA announces the desynchronization of Cernavoda NPP Unit 1 from the national power grig, on April 19th\u00a02010, as consequence to an earth flaw of the S phase on a 24 kV bar. The 24 kV bar connects the turbo generator to the power evacuation transformer, being situated outside the turbo generator building. The [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":929,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-1381","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/1381","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=1381"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/1381\/revisions"}],"predecessor-version":[{"id":43989,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/1381\/revisions\/43989"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=1381"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=1381"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=1381"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}