{"id":19493,"date":"2018-03-25T15:00:12","date_gmt":"2018-03-25T15:00:12","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=19493"},"modified":"2025-02-24T13:47:55","modified_gmt":"2025-02-24T13:47:55","slug":"press-release-power-reduction-at-unit-2","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2018\/03\/25\/press-release-power-reduction-at-unit-2\/","title":{"rendered":"Press release &#8211; Power reduction at Unit 2"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p style=\"text-align: center\"><strong>Press release<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>Bucharest, 25 March 2018<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify\">\u00a0S.N. Nuclearelectrica SA (\u201cSNN\u201d) announces the reduction of power at Cernavoda NPP Unit 2 to 55% (aprox. 300 MW).<\/p>\n<p style=\"text-align: justify\">The power reduction of Cernavoda NPP Unit 2 is caused by the need to replace a component (bearing) at the engine of a condensation pump, in the classical part of the power plant. The power reduction to 55% is necessary in order to shut down the respective equipment for repair works.<\/p>\n<p style=\"text-align: justify\">During the power reduction, Cernavoda NPP Unit 2 will remain connected to the National Power Grid and operate a 300 MW.<\/p>\n<p style=\"text-align: justify\">Cernavoda NPP Unit 2 will reach nominal power after the completion of repair works and equipment replacement, power reduction duration being estimated at 16 hours until nominal power.<\/p>\n<p style=\"text-align: justify\">Unit 2 power reduction and the repair works will have no adverse impact on the personnel, population and environments; works will be performed in compliance with the procedures od the power plant.<\/p>\n<p>&nbsp;<\/p>\n<p>Cosmin Ghita<\/p>\n<p>CEO<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Press release &nbsp; Bucharest, 25 March 2018 &nbsp; \u00a0S.N. Nuclearelectrica SA (\u201cSNN\u201d) announces the reduction of power at Cernavoda NPP Unit 2 to 55% (aprox. 300 MW). The power reduction of Cernavoda NPP Unit 2 is caused by the need to replace a component (bearing) at the engine of a condensation pump, in the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1078,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-19493","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/19493","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=19493"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/19493\/revisions"}],"predecessor-version":[{"id":43860,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/19493\/revisions\/43860"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=19493"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=19493"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=19493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}