{"id":2052,"date":"2014-09-09T12:04:09","date_gmt":"2014-09-09T12:04:09","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=2052"},"modified":"2025-02-24T13:47:56","modified_gmt":"2025-02-24T13:47:56","slug":"re-connection-of-unit-2-to-the-national-power-grid","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2014\/09\/09\/re-connection-of-unit-2-to-the-national-power-grid\/","title":{"rendered":"Re-connection of Unit 2 to the National Power Grid"},"content":{"rendered":"<p style=\"text-align: justify\">Societatea Nationala Nuclearelectrica S.A. announces the reconnection of Cernavoda NPP Unit 2 to the National Power Grid on September 9<sup>th<\/sup>\u00a02014; the unit will reach nominal power at 21:00 hours.<\/p>\n<p style=\"text-align: justify\">Cernavoda NPP Unit 2 was disconnected from the National Power Grid on September 8<sup>th<\/sup>\u00a02014, 17:30 hours, following a malfunction occurred at the electric generator, which was repaired by the specialists of the nuclear power plant with the support of the manufacturer of the installation (General Electric).<\/p>\n<p style=\"text-align: justify\">The repair works were performed in accordance with the approved procedures used by Cernavoda NPP in safe conditions for the personnel, population and environment.<\/p>\n<p style=\"color: #595959\">\n<p style=\"color: #595959\">\u00a0<strong>\u00a0<\/strong><\/p>\n<p style=\"color: #595959\"><strong>Daniela Lulache<\/strong><\/p>\n<p style=\"color: #595959\"><strong>CEO\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Societatea Nationala Nuclearelectrica S.A. announces the reconnection of Cernavoda NPP Unit 2 to the National Power Grid on September 9th\u00a02014; the unit will reach nominal power at 21:00 hours. Cernavoda NPP Unit 2 was disconnected from the National Power Grid on September 8th\u00a02014, 17:30 hours, following a malfunction occurred at the electric generator, which was [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1078,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-2052","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/2052","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=2052"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/2052\/revisions"}],"predecessor-version":[{"id":43927,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/2052\/revisions\/43927"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=2052"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=2052"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=2052"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}