{"id":23262,"date":"2018-09-04T11:05:56","date_gmt":"2018-09-04T11:05:56","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=23262"},"modified":"2025-02-24T13:47:54","modified_gmt":"2025-02-24T13:47:54","slug":"controlled-outage-of-cernavoda-npp-unit-2","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2018\/09\/04\/controlled-outage-of-cernavoda-npp-unit-2\/","title":{"rendered":"Controlled outage of Cernavoda NPP Unit 2"},"content":{"rendered":"<p class=\"normal\" style=\"text-align: justify\"><strong>04.09.2018<\/strong><\/p>\n<p class=\"normal\" style=\"text-align: justify\"><strong>Bucharest<\/strong><\/p>\n<p class=\"normal\" style=\"text-align: justify\">\n<p class=\"normal\" style=\"text-align: center\"><strong>Press release<\/strong><\/p>\n<p class=\"normal\" style=\"text-align: center\">\n<p class=\"normal\" style=\"text-align: justify\"><span class=\"normalchar\"><span style=\"font-size: 11.0pt\">SN Nuclearelectrica SA (\u201cSNN\u201d) announces that Cernavoda NPPUnit 2 will be shutdown in a controlled manner on 05.09.2018, starting with 15:00, in order to perform repair works at the bridge of the fuel loading\/unloading machine (\u201cMID\u201d).<\/span><\/span><\/p>\n<p class=\"normal\" style=\"text-align: justify\"><span class=\"normalchar\"><span style=\"font-size: 11.0pt\">We estimate that the controlled outage will last 72 hours.<\/span><\/span><\/p>\n<p class=\"normal\" style=\"text-align: justify\"><span class=\"normalchar\"><span style=\"font-size: 11.0pt\">The controlled outage and the repair works will be completed under full safety conditions in compliance with the procedures of the power plant.<\/span><\/span><\/p>\n<p class=\"normal\" style=\"text-align: justify\"><span class=\"normalchar\"><span style=\"font-size: 11.0pt\">SNN will issue a press release upon the completion of works and reconnection of Unit 2 to the National Power Grid.<\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>04.09.2018 Bucharest Press release SN Nuclearelectrica SA (\u201cSNN\u201d) announces that Cernavoda NPPUnit 2 will be shutdown in a controlled manner on 05.09.2018, starting with 15:00, in order to perform repair works at the bridge of the fuel loading\/unloading machine (\u201cMID\u201d). We estimate that the controlled outage will last 72 hours. The controlled outage and the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":16522,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-23262","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/23262","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=23262"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/23262\/revisions"}],"predecessor-version":[{"id":43848,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/23262\/revisions\/43848"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=23262"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=23262"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=23262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}