{"id":23988,"date":"2018-10-15T10:01:33","date_gmt":"2018-10-15T10:01:33","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=23988"},"modified":"2025-02-24T13:47:54","modified_gmt":"2025-02-24T13:47:54","slug":"power-reduction-at-cernavoda-npp-unit-2","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2018\/10\/15\/power-reduction-at-cernavoda-npp-unit-2\/","title":{"rendered":"Power reduction at Cernavoda NPP Unit 2"},"content":{"rendered":"<p style=\"text-align: center\"><strong>Press release<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Bucharest, 15 October 2018<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>SN Nuclearelectrica SA (\u201cSNN\u201d) announces that Cernavoda NPP Unit 2 will operate, starting with 13:00 hours, October 15<sup>th<\/sup>, 2018 at a reduced power in oder to implement repair works at a tank related to the turbogenerator (the classical part of the power plant).<\/p>\n<p>The repair works can only be carried out\u00a0 at a reduced output of Unit 2. We estimate that Unit 2 will operate at a reduced power of cca 300-350 MW for a period of 12 hours.<\/p>\n<p>The controlled power reduction and the completion of the repair works will be carried out under full safety conditions, in compliance with the specific procedures of the power plant.<\/p>\n<p>&nbsp;<\/p>\n<p>Cosmin Ghita<\/p>\n<p>CEO<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Press release \u00a0 Bucharest, 15 October 2018 \u00a0 SN Nuclearelectrica SA (\u201cSNN\u201d) announces that Cernavoda NPP Unit 2 will operate, starting with 13:00 hours, October 15th, 2018 at a reduced power in oder to implement repair works at a tank related to the turbogenerator (the classical part of the power plant). The repair works can [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":16522,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-23988","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/23988","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=23988"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/23988\/revisions"}],"predecessor-version":[{"id":43846,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/23988\/revisions\/43846"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=23988"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=23988"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=23988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}