{"id":24005,"date":"2018-10-16T07:16:55","date_gmt":"2018-10-16T07:16:55","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=24005"},"modified":"2025-02-24T13:47:54","modified_gmt":"2025-02-24T13:47:54","slug":"the-return-to-full-power-of-unit-2","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2018\/10\/16\/the-return-to-full-power-of-unit-2\/","title":{"rendered":"The return to full power of Unit 2"},"content":{"rendered":"<p style=\"text-align: center\">\u00a0<strong>Press release<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Bucharest, 16 October 2018<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>SN Nuclearelectrica SA (\u201cSNN\u201d) announces that Cernavoda NPP Unit 2 is operating at full power, as the repair works at the tank related to the turboenerator (the classical part of the power plant) have been completed.<\/p>\n<p>We remind the fact that the repair works could only be performed with the reactor at a reduced power.<\/p>\n<p>The controlled power reduction and the completion of works were performed under full safety conditions and in compliance with the procedures of the power plant.<\/p>\n<p>&nbsp;<\/p>\n<p>Cosmin Ghita<\/p>\n<p>CEO<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0Press release \u00a0 Bucharest, 16 October 2018 \u00a0 SN Nuclearelectrica SA (\u201cSNN\u201d) announces that Cernavoda NPP Unit 2 is operating at full power, as the repair works at the tank related to the turboenerator (the classical part of the power plant) have been completed. We remind the fact that the repair works could only be [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":16522,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-24005","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/24005","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=24005"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/24005\/revisions"}],"predecessor-version":[{"id":43845,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/24005\/revisions\/43845"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=24005"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=24005"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=24005"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}