{"id":24303,"date":"2018-11-01T10:01:23","date_gmt":"2018-11-01T10:01:23","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=24303"},"modified":"2025-02-24T13:47:54","modified_gmt":"2025-02-24T13:47:54","slug":"power-reduction-at-cernavoda-npp-unit-1-starting-with-2-11-2018","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2018\/11\/01\/power-reduction-at-cernavoda-npp-unit-1-starting-with-2-11-2018\/","title":{"rendered":"Power reduction at Cernavoda NPP Unit 1 starting with 2.11.2018"},"content":{"rendered":"<p style=\"text-align: center\"><strong>Press release<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Bucharest, 1 November 2018<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>SN Nuclearelectrica SA (\u201cSNN\u201d) announces that Cernavoda NPP Unit 1 will operate, starting with 08\u00a0:00 hours, on November 2<sup>nd<\/sup> 2018, at a reduced power, in order to perform repair works at a tank related to the turbogenerator group (the classical part of the power plant).<\/p>\n<p>&nbsp;<\/p>\n<p>Cernavoda NPP Unit 1 will operate at a reduced power of about 500 MW, as the repair works can only be performed with the reactor at a reduced power.<\/p>\n<p>&nbsp;<\/p>\n<p>The controlled power reduction and the repair works will be performed under full safety conditions and in compliance with the specific procedures of the power plant.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Cosmin Ghita<\/p>\n<p>CEO<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Press release \u00a0 Bucharest, 1 November 2018 \u00a0 SN Nuclearelectrica SA (\u201cSNN\u201d) announces that Cernavoda NPP Unit 1 will operate, starting with 08\u00a0:00 hours, on November 2nd 2018, at a reduced power, in order to perform repair works at a tank related to the turbogenerator group (the classical part of the power plant). &nbsp; Cernavoda [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":24304,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-24303","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/24303","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=24303"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/24303\/revisions"}],"predecessor-version":[{"id":43844,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/24303\/revisions\/43844"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=24303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=24303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=24303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}