{"id":24322,"date":"2018-11-03T07:41:14","date_gmt":"2018-11-03T07:41:14","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=24322"},"modified":"2025-02-24T13:47:54","modified_gmt":"2025-02-24T13:47:54","slug":"the-return-to-full-power-of-cernavoda-npp-unit-1","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2018\/11\/03\/the-return-to-full-power-of-cernavoda-npp-unit-1\/","title":{"rendered":"The return to full power of Cernavoda NPP Unit 1"},"content":{"rendered":"<p><strong>\u00a0<\/strong><\/p>\n<p style=\"text-align: center\"><strong>Press release<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Bucharest, 3 November 2018<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p style=\"text-align: justify\">SN Nuclearelectrica SA (\u201cSNN\u201d) announces that Cernavoda NPP Unit 1 is operating at full power, as the repair works on the tank related to the turbogenerator (the classical part of the power plant) have been completed.<\/p>\n<p style=\"text-align: justify\">We remind the fact that the repair works could only be performed with Unit 1 reactor at a reduced power.<\/p>\n<p style=\"text-align: justify\">The controlled power reduction and the completion of the works were performed under full nuclear safety conditions in compliance with the specific procedures of the power plant.<\/p>\n<p>&nbsp;<\/p>\n<p>Cosmin Ghita<\/p>\n<p>CEO<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 Press release \u00a0 Bucharest, 3 November 2018 \u00a0 \u00a0 SN Nuclearelectrica SA (\u201cSNN\u201d) announces that Cernavoda NPP Unit 1 is operating at full power, as the repair works on the tank related to the turbogenerator (the classical part of the power plant) have been completed. We remind the fact that the repair works could [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":24304,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-24322","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/24322","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=24322"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/24322\/revisions"}],"predecessor-version":[{"id":43843,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/24322\/revisions\/43843"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=24322"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=24322"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=24322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}