{"id":29540,"date":"2019-09-24T19:07:41","date_gmt":"2019-09-24T19:07:41","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=29540"},"modified":"2025-02-24T13:06:20","modified_gmt":"2025-02-24T13:06:20","slug":"comunicat-de-presa-reconectarea-unitatii-1-cne-cernavoda-la-sen","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/2019\/09\/24\/comunicat-de-presa-reconectarea-unitatii-1-cne-cernavoda-la-sen\/","title":{"rendered":"Comunicat de presa-Reconectarea Unitatii 1 CNE Cernavoda la SEN"},"content":{"rendered":"<p>S.N. Nuclearelectrica SA (\u201cSNN\u201d) anun\u0163\u0103 c\u0103 Unitatea 1 a CNE Cernavoda a fost reconectata la Sistemul Energetic in data de 24.09.2019, ora 21:31, dupa finalizarea lucrarilor de remediere.<\/p>\n<p>Unitatea 1 a fost oprita controlat in dimineata zilei de 18.09.2019 in vederea efectuarii unor lucrari de reparatie a unor neetanseitati (scurgere minora de agent de racire) din sistemul primar de transfer al caldurii al reactorului Unitatii 1.<\/p>\n<p>Conform procedurilor specifice ale CNE Cernavod\u0103, efectuarea lucr\u0103rilor de remediere se poate realiza numai cu Unitatea \u00een stare oprit\u0103.<\/p>\n<p>Oprirea controlata nu a avut impact asupra securitatii nucleare, personalului, populatiei si mediului inconjurator, lucrarile de remediere fiind realizate in conformitate cu procedurile aplicabile in astfel de situatii.<\/p>\n<p>Cosmin Ghi\u0163\u0103<\/p>\n<p>Director General<\/p>\n","protected":false},"excerpt":{"rendered":"<p>S.N. Nuclearelectrica SA (\u201cSNN\u201d) anun\u0163\u0103 c\u0103 Unitatea 1 a CNE Cernavoda a fost reconectata la Sistemul Energetic in data de 24.09.2019, ora 21:31, dupa finalizarea lucrarilor de remediere. Unitatea 1 a fost oprita controlat in dimineata zilei de 18.09.2019 in vederea efectuarii unor lucrari de reparatie a unor neetanseitati (scurgere minora de agent de racire) [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":21419,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[316,256],"tags":[],"class_list":["post-29540","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-comunicate-de-presa","category-media"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/29540","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=29540"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/29540\/revisions"}],"predecessor-version":[{"id":45090,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/29540\/revisions\/45090"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=29540"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=29540"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=29540"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}