{"id":33463,"date":"2021-01-29T21:41:25","date_gmt":"2021-01-29T19:41:25","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=33463"},"modified":"2025-02-24T13:47:53","modified_gmt":"2025-02-24T13:47:53","slug":"cernavoda-npp-unit-1-was-reconnected-to-the-national-energy-system","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2021\/01\/29\/cernavoda-npp-unit-1-was-reconnected-to-the-national-energy-system\/","title":{"rendered":"Cernavoda NPP Unit 1 was reconnected to the National Energy System"},"content":{"rendered":"<p style=\"text-align: center\"><strong>Press release<\/strong><\/p>\n<p style=\"text-align: center\"><strong>Cernavoda NPP Unit 1 was reconnected to the National Energy System <\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Bucharest, January 29, 2021 <\/strong><\/p>\n<p>SN Nuclearelectrica SA announces that Cernavoda NPP Unit 1 was reconnected to the National Energy System.<\/p>\n<p>Cernavoda NPP Unit 1 was shutdown in a controlled manner on the night of January 22 to January 23 in order to carry out remediation works to the classic\/secondary circuit of Unit 1.<\/p>\n<p>The remediation works were carried out in compliance with the specific procedures applicable in such situations. The controlled shutdown of Unit 1 and remediation works had no impact on nuclear safety, personnel, population or environment.<\/p>\n<p>&nbsp;<\/p>\n<p>Cosmin Ghita<\/p>\n<p>Director General<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Press release Cernavoda NPP Unit 1 was reconnected to the National Energy System \u00a0 Bucharest, January 29, 2021 SN Nuclearelectrica SA announces that Cernavoda NPP Unit 1 was reconnected to the National Energy System. Cernavoda NPP Unit 1 was shutdown in a controlled manner on the night of January 22 to January 23 in order [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":32568,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-33463","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/33463","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=33463"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/33463\/revisions"}],"predecessor-version":[{"id":43810,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/33463\/revisions\/43810"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=33463"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=33463"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=33463"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}