{"id":34770,"date":"2021-07-29T00:55:36","date_gmt":"2021-07-28T21:55:36","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=34770"},"modified":"2025-02-24T13:47:52","modified_gmt":"2025-02-24T13:47:52","slug":"automatic-disconnection-of-cernavoda-npp-unit-2-from-the-grid","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2021\/07\/29\/automatic-disconnection-of-cernavoda-npp-unit-2-from-the-grid\/","title":{"rendered":"Automatic disconnection of Cernavoda NPP Unit 2 from the grid"},"content":{"rendered":"<p><strong>Bucharest, July 29, 2021<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Press release<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>SN Nuclearelectrica SA announces that Cernavoda NPP Unit 2 automatically disconnected from the power grid on the evening of July 28, 2021 following a transient in the energy system which affected the classical part of the unit, without affecting the nuclear safety functions of the reactor.<\/p>\n<p>The automatic disconnect of Unit 2 occurred under safety conditions, all the systems of the units functioning and responding in compliance with the design in such circumstances.<\/p>\n<p>The automatic disconnection of Unit 2 and remediation works have no impact on the nuclear safety of the reactor, personnel, population and environment.<\/p>\n<p>SN Nuclearelectrica SA will issue a press release when Unit 2 is reconnected to the power grid.<\/p>\n<p>&nbsp;<\/p>\n<p>Cosmin Ghita<\/p>\n<p>Director General<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bucharest, July 29, 2021 \u00a0 \u00a0 Press release &nbsp; &nbsp; SN Nuclearelectrica SA announces that Cernavoda NPP Unit 2 automatically disconnected from the power grid on the evening of July 28, 2021 following a transient in the energy system which affected the classical part of the unit, without affecting the nuclear safety functions of the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":31994,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-34770","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/34770","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=34770"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/34770\/revisions"}],"predecessor-version":[{"id":43797,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/34770\/revisions\/43797"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=34770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=34770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=34770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}