{"id":35039,"date":"2021-09-17T17:50:54","date_gmt":"2021-09-17T14:50:54","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=35039"},"modified":"2025-02-24T13:47:52","modified_gmt":"2025-02-24T13:47:52","slug":"power-reduction-of-cernavoda-npp-unit-1","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2021\/09\/17\/power-reduction-of-cernavoda-npp-unit-1\/","title":{"rendered":"Power reduction of Cernavoda NPP Unit 1"},"content":{"rendered":"<p><strong>Press release<\/strong><\/p>\n<p>Bucharest, September 17<sup>th<\/sup> 2021<\/p>\n<p>S.N. Nuclearelectrica S.A (\u201cSNN\u201d) announces that \u00a0Cernavoda NPP Unit 1 will operate, starting with 01:00 hours, on September 18<sup>th<\/sup> 2021, at a reduced power in order to perform repair works to an equipment of the classical part of the power plant.<\/p>\n<p>The power reduction is necessary as the repair works cannot be performed with the unit operating at nominal power.<\/p>\n<p>After completing the activities, Unit 1 will operate again at nominal power.<\/p>\n<p>The controlled power reduction and the repair works are prepared and performed under full safety conditions and in compliance with the specific procedures of the power plant.<\/p>\n<p>Cosmin Ghita<\/p>\n<p>CEO<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Press release Bucharest, September 17th 2021 S.N. Nuclearelectrica S.A (\u201cSNN\u201d) announces that \u00a0Cernavoda NPP Unit 1 will operate, starting with 01:00 hours, on September 18th 2021, at a reduced power in order to perform repair works to an equipment of the classical part of the power plant. The power reduction is necessary as the repair [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":34829,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-35039","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/35039","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=35039"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/35039\/revisions"}],"predecessor-version":[{"id":43793,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/35039\/revisions\/43793"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=35039"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=35039"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=35039"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}