{"id":35581,"date":"2021-12-29T18:04:23","date_gmt":"2021-12-29T16:04:23","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/?p=35581"},"modified":"2025-02-24T13:47:52","modified_gmt":"2025-02-24T13:47:52","slug":"controlled-shutdown-of-cernavoda-npp-unit-1","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2021\/12\/29\/controlled-shutdown-of-cernavoda-npp-unit-1\/","title":{"rendered":"Controlled shutdown of Cernavoda NPP Unit 1"},"content":{"rendered":"<p><strong>Press release<\/strong><\/p>\n<p><strong>Bucharest, December 29th, 2021 <\/strong><\/p>\n<p>SN Nuclearelectrica SA (SNN) announces that Unit 1 of Cernavoda NPP is to be shutdown in a controlled manner in the evening of December 29th, 2021 in order to perform repair works at a lightning rod fitted on one of the power evacuation poles of Unit 1.<\/p>\n<p>Performing repair works requires the controlled shutdown of Unit 1.<\/p>\n<p>The repair works are done in compliance with Cernavoda NPP procedures and they have no impact on personnel, population or environment.<\/p>\n<p>SN Nuclearelectrica will issue a press release for the reconnection of Cernavoda NPP Unit 1 to the power grid after the completion of the repair works.<\/p>\n<p>&nbsp;<\/p>\n<p>Cosmin Ghita<\/p>\n<p>Chief Executive Officer<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Press release Bucharest, December 29th, 2021 SN Nuclearelectrica SA (SNN) announces that Unit 1 of Cernavoda NPP is to be shutdown in a controlled manner in the evening of December 29th, 2021 in order to perform repair works at a lightning rod fitted on one of the power evacuation poles of Unit 1. Performing repair [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":31994,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-35581","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/35581","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=35581"}],"version-history":[{"count":1,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/35581\/revisions"}],"predecessor-version":[{"id":43784,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/35581\/revisions\/43784"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=35581"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=35581"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=35581"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}