{"id":47790,"date":"2026-05-30T18:45:29","date_gmt":"2026-05-30T18:45:29","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/snn\/?p=47790"},"modified":"2026-05-30T18:46:51","modified_gmt":"2026-05-30T18:46:51","slug":"resynchronization-of-unit-2-of-the-cernavoda-nuclear-power-plant-with-the-national-power-grid","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2026\/05\/30\/resynchronization-of-unit-2-of-the-cernavoda-nuclear-power-plant-with-the-national-power-grid\/","title":{"rendered":"Resynchronization of Unit 2 of the Cernavoda Nuclear Power Plant with the National Power Grid"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"47790\" class=\"elementor elementor-47790\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-808163f elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"808163f\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-d33f03c top column-style-top\" data-id=\"d33f03c\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-ec2635e elementor-widget elementor-widget-text-editor\" data-id=\"ec2635e\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Press Release<\/strong><\/p><p><strong>Resynchronization of Unit 2 of the Cernavoda Nuclear Power Plant with the National Power Grid<\/strong><\/p><p><strong>\u00a0<\/strong><strong>Bucharest, May 30, 2026 <\/strong><\/p><p>Nuclearelectrica SA announces that Unit 2 of the Cernavoda Nuclear Power Plant was resynchronized with the National Power Grid on the evening of May 30, 2026.<\/p><p>Unit 2 of\u00a0 Cernavoda NPP automatically disconnected from the grid on the evening of May 4 due to a malfunction in an insulator associated with the power output transformer, which required replacing the Cernavoda NPP Unit 2 transformer with a spare unit and, consequently, a longer outage period, given that the work to replace the electrical transformer is a complex operation that involves isolating, dismantling, and relocating the original transformer, as well as complex testing and calibration of the new transformer, in strict compliance with nuclear industry standards.<\/p><p>During the repair work and replacement of the transformer with the spare unit, the Unit 2 reactor was kept safely shut down, with no impact on nuclear safety, personnel, the public, or the environment, in strict compliance with applicable procedures.<\/p><p>\u00a0<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Press Release Resynchronization of Unit 2 of the Cernavoda Nuclear Power Plant with the National Power Grid \u00a0Bucharest, May 30, 2026 Nuclearelectrica SA announces that Unit 2 of the Cernavoda Nuclear Power Plant was resynchronized with the National Power Grid on the evening of May 30, 2026. Unit 2 of\u00a0 Cernavoda NPP automatically disconnected from [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,260,262],"tags":[],"class_list":["post-47790","post","type-post","status-publish","format-standard","hentry","category-fara-categorie","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/47790","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=47790"}],"version-history":[{"count":4,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/47790\/revisions"}],"predecessor-version":[{"id":47794,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/47790\/revisions\/47794"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=47790"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=47790"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=47790"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}