{"id":48698,"date":"2026-11-09T08:49:52","date_gmt":"2026-11-09T08:49:52","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/snn\/?p=48698"},"modified":"2026-11-09T08:50:23","modified_gmt":"2026-11-09T08:50:23","slug":"romanias-prime-minister-and-minister-of-energy-visit-cernavoda-nuclear-power-plant-cernavoda-npp-unit-1-is-functioning-following-its-synchronization-with-the-national-energy-system-on-novem","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2026\/11\/09\/romanias-prime-minister-and-minister-of-energy-visit-cernavoda-nuclear-power-plant-cernavoda-npp-unit-1-is-functioning-following-its-synchronization-with-the-national-energy-system-on-novem\/","title":{"rendered":"Romania\u2019s Prime Minister and Minister of Energy Visit Cernavod\u0103 Nuclear Power Plant. Cernavoda NPP Unit 1 is functioning, following its synchronization with the National Energy System on November 6, 2026."},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"48698\" class=\"elementor elementor-48698\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-a8d39a8 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"a8d39a8\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-64f4218 top column-style-top\" data-id=\"64f4218\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-e285eda elementor-widget elementor-widget-text-editor\" data-id=\"e285eda\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>November 7, 2026<\/strong><\/p><p>Romania\u2019s Prime Minister, Luca Niculescu, and Minister of Energy, Dumitru Chis\u0103li\u021b\u0103, visited Cernavod\u0103 Nuclear Power Plant (NPP) on Saturday, November 7, 2026.<\/p><p>The official visit marks the restart of Unit 1, following its synchronization with the National Energy System on November 6, 2026, carried out under nuclear safety standards and in full compliance with the plant\u2019s operating procedures.<\/p><p>Prime Minister of Romania, Luca Niculescu: \u201cThe prolonged outage of production at the Cernavod\u0103 Nuclear Power Plant, which currently accounts for approximately 20% of Romania\u2019s electricity consumption, has provided an important lesson, highlighting the extent to which energy security depends on the availability of reliable and stable generation capacity, as well as the critical role of nuclear energy in supporting the economy, the welfare of Romanian citizens and their quality of life. Domestic energy production provides stability, including price stability, and gives Romania greater control over its own economic future. For these reasons, the Government will firmly support projects aimed at ensuring the continued safe and reliable operation of the nuclear power plant, such as Bala II, as well as investments designed to expand the country\u2019s electricity generation capacity through the development of Cernavod\u0103 Units 3 and 4.\u201d<\/p><p>Currently, Unit 1 is operating at 50% of its nominal power.<\/p><p>Minister of Energy, Dumitru Chis\u0103li\u021b\u0103: <em>\u201cNuclear energy plays an essential role in ensuring energy security and maintaining the stability of the National Energy System. Following this challenging period, we are now seeing the prospects for greater stability.<\/em><\/p><p><em>The restart of Cernavod\u0103 NPP Unit 1, followed by the restart of Unit 2 once the required conditions will be met, will make a substantial contribution to balancing the energy system and restoring consumers\u2019 confidence in the recovery and improvement of a situation that has affected them.<\/em> <em>Energy system stability and the interests of consumers are our highest priorities, and I assure you that the Ministry of Energy addresses these responsibilities with the utmost commitment and accountability.\u201d<\/em><\/p><p>Accompanied by Nuclearelectrica\u2019s leadership team, the officials visited the Unit 1 Main Control Room and held discussions on identifying short, medium and long-term solutions to ensure the continuous operation of the plant, including in the context of Nuclearelectrica\u2019s projects to double Romania\u2019s nuclear capacity through the construction of Units 3 and 4.<\/p><p>Mihai Gioar\u0103, Chief Executive Officer, Nuclearelectrica: <em>\u201cThe reconnection of Cernavod\u0103 NPP Unit 1 to the National Energy System, following the outage caused by adverse weather conditions, represents an important milestone for the company and for Romania\u2019s energy sector. The unit\u2019s return to service contributes to the country\u2019s energy security and to the stability of the National Energy System.<\/em> <em>I would like to thank my colleagues for the professionalism and sense of responsibility, which they fulfilled their duties with, while consistently ensuring compliance with nuclear safety requirements, which remain the fundamental principles underpinning all our activities.<\/em> <em>We also thank the authorities for their support throughout this process.<\/em> <em>At the same time, this milestone provides us with an opportunity to review and assess the experience gained. Based on conclusions, we will adjust our strategic approach for the coming period and identify solutions aimed at reducing the risk of similar situations occurring in the future.<\/em> <em>We reaffirm our commitment to operating the plant safely and in full compliance with national and international standards, while ensuring the production of clean, safe and reliable electricity to Romania.\u201d<\/em><\/p><p>Nuclearelectrica reaffirms its firm commitment to continuing the measures already underway and working closely with the competent authorities to develop concrete short, medium and long-term solutions aimed at enhancing plant availability and ensuring the uninterrupted operation of Cernavod\u0103 Nuclear Power Plant.<\/p><p>\u00a0<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>November 7, 2026 Romania\u2019s Prime Minister, Luca Niculescu, and Minister of Energy, Dumitru Chis\u0103li\u021b\u0103, visited Cernavod\u0103 Nuclear Power Plant (NPP) on Saturday, November 7, 2026. The official visit marks the restart of Unit 1, following its synchronization with the National Energy System on November 6, 2026, carried out under nuclear safety standards and in full [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,260,262],"tags":[],"class_list":["post-48698","post","type-post","status-publish","format-standard","hentry","category-fara-categorie","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/48698","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=48698"}],"version-history":[{"count":4,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/48698\/revisions"}],"predecessor-version":[{"id":48702,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/48698\/revisions\/48702"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=48698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=48698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=48698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}