{"id":48709,"date":"2026-11-09T08:55:26","date_gmt":"2026-11-09T08:55:26","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/snn\/?p=48709"},"modified":"2026-11-09T08:57:23","modified_gmt":"2026-11-09T08:57:23","slug":"press-release-start-of-procedures-for-cernavoda-nuclear-power-plant-unit-2-reconnection-to-the-national-energy-system","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2026\/11\/09\/press-release-start-of-procedures-for-cernavoda-nuclear-power-plant-unit-2-reconnection-to-the-national-energy-system\/","title":{"rendered":"Press release. Start of Procedures for Cernavod\u0103 Nuclear Power Plant Unit 2 reconnection to the National Energy System"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"48709\" class=\"elementor elementor-48709\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-0fe2c45 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"0fe2c45\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-9abf96d top column-style-top\" data-id=\"9abf96d\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-4b62ef8 elementor-widget elementor-widget-text-editor\" data-id=\"4b62ef8\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>\u00a0<\/strong><strong>November 9, 2026<\/strong><\/p><p>SN Nuclearelectrica SA announces that today, November 9, 2026, the procedures for Cernavod\u0103 Nuclear Power Plant Unit 2 reconnection will begin, following the attainment of the water level required to restart the unit under conditions of maximum safety, in compliance with all nuclear safety measures.<\/p><p>Unit 2 is expected to be synchronized on November 10, 2026, and is scheduled to reach nominal power on November 11, 2026.<\/p><p>Mihai Gioar\u0103, CEO of Nuclearelectrica: \u201cStarting November 11, 2026, CNE Cernavod\u0103 will operate both nuclear units, thereby supporting to ensure approximately 20% of Romania\u2019s energy needs.<\/p><p>Nuclear energy is and remains a strategic energy source for ensuring Romania\u2019s energy security and the stability of the power system. I would like to thank, once again, the teams of professionals at CNE Cernavod\u0103 for observing all safety conditions during the period when the units were maintained in a safe shutdown state.\u201d<\/p><p>All procedures for restarting and reconnecting Unit 2 of CNE Cernavod\u0103 to the National Energy System are carried out in accordance with CNE Cernavod\u0103\u2019s applicable procedures, under safe conditions, and with the Nuclearelectrica team assuming full accountability.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>\u00a0November 9, 2026 SN Nuclearelectrica SA announces that today, November 9, 2026, the procedures for Cernavod\u0103 Nuclear Power Plant Unit 2 reconnection will begin, following the attainment of the water level required to restart the unit under conditions of maximum safety, in compliance with all nuclear safety measures. Unit 2 is expected to be synchronized [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,260,262],"tags":[],"class_list":["post-48709","post","type-post","status-publish","format-standard","hentry","category-fara-categorie","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/48709","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=48709"}],"version-history":[{"count":4,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/48709\/revisions"}],"predecessor-version":[{"id":48713,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/48709\/revisions\/48713"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=48709"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=48709"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=48709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}