{"id":48781,"date":"2026-11-11T09:21:06","date_gmt":"2026-11-11T09:21:06","guid":{"rendered":"https:\/\/nuclearelectrica.ro\/snn\/?p=48781"},"modified":"2026-11-11T09:21:28","modified_gmt":"2026-11-11T09:21:28","slug":"unit-1-of-the-cernavoda-nuclear-power-plant-will-be-reconnected-to-the-national-energy-system","status":"publish","type":"post","link":"https:\/\/nuclearelectrica.ro\/snn\/en\/2026\/11\/11\/unit-1-of-the-cernavoda-nuclear-power-plant-will-be-reconnected-to-the-national-energy-system\/","title":{"rendered":"Unit 1 of the Cernavod\u0103 Nuclear Power Plant Will Be Reconnected to the National Energy System"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"48781\" class=\"elementor elementor-48781\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-278526b elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"278526b\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-1488086 top column-style-top\" data-id=\"1488086\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-df985a2 elementor-widget elementor-widget-text-editor\" data-id=\"df985a2\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>\u00a0<\/strong><strong>PRESS RELEASE <\/strong>&#8211; November 11, 2026<\/p><p>SN Nuclearelectrica SA announces that Unit 1 of the Cernavod\u0103 Nuclear Power Plant will be reconnected to the National Energy System on November 12, 2026, following the completion of repair work by Cernavod\u0103 Nuclear Power Plant specialists.<\/p><p>Unit 1 will reach nominal power on November 13, 2026.<\/p><p>In addition, Unit 2 of CNE Cernavod\u0103 was connected to the National Power System on November 11, 2026, and is expected to reach nominal power on November 12.<\/p><p>The repair work and reconnection of Unit 1, as well as the connection of Unit 2 to the National Energy System, were carried out in accordance with applicable procedures, under conditions of maximum nuclear safety, with no impact on personnel or the environment.<\/p><p>Starting November 13, 2026, both units of the Cernavod\u0103 Nuclear Power Plant will operate at nominal power, providing approximately 20% of Romania\u2019s electricity demand.<\/p><p>\u00a0<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>\u00a0PRESS RELEASE &#8211; November 11, 2026 SN Nuclearelectrica SA announces that Unit 1 of the Cernavod\u0103 Nuclear Power Plant will be reconnected to the National Energy System on November 12, 2026, following the completion of repair work by Cernavod\u0103 Nuclear Power Plant specialists. Unit 1 will reach nominal power on November 13, 2026. In addition, [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[260,262],"tags":[],"class_list":["post-48781","post","type-post","status-publish","format-standard","hentry","category-media-en","category-press-releases"],"_links":{"self":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/48781","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/comments?post=48781"}],"version-history":[{"count":4,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/48781\/revisions"}],"predecessor-version":[{"id":48785,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/posts\/48781\/revisions\/48785"}],"wp:attachment":[{"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/media?parent=48781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/categories?post=48781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuclearelectrica.ro\/snn\/wp-json\/wp\/v2\/tags?post=48781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}